My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
83-018 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
1983
>
83-018 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2014 12:36:23 PM
Creation date
12/26/2013 9:40:47 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
83-018
Legislation Date
12/1/1987
Year
1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. . ?. <br />. , . ? <br />services of the types described in paragraph 3.3, and <br />act as OWNER's representative in connection with any <br />such services. <br />1.2.3. Provide analyses of OWNER's needs, planning <br />surveys, site evaluations and comparative studies of <br />prospective sites and solutions. <br />1•2•4. Provide a general economic analysis of <br />OWNER's requirements applicable to various alter- <br />natives. <br />1.2.5. Prepare a Report containing schematic layouts, <br />sketches and conceptual design criteria with appropri- <br />ate exhibits to indicate clearly the considerations in- <br />volved and the alternative solutions available to <br />OWNER and setting forth ENGINEER's findings and <br />recommendations with opinions of probable costs for <br />the Project, including Construction Cost, contingen- <br />cies, allowances for charges of all professionals and <br />consultants, al]owances for the cost ofland and rights- <br />of-way, compensation for or damages to properties and <br />interest and financing charges (all of which are herein- <br />after called "Project Costs"). <br />1.2.6. Furnish five copies of the Report and present <br />and review it in person with OWNER. <br />The duties and responsibilities of ENGINEER during <br />the Study and Report Phase are amended and supple- <br />mented as indicated in paragraph 2 of Exhibit A"Fur- <br />ther Description of Basic Engineering Services and <br />Related Matters". <br />1.3. Preliminary Design Phase. <br />1.3.1. In consultation with OWNER and on the basis <br />of the accepted Report, determine the extent of the <br />Project. <br />1.3.2. Prepare preliminary design documents consist- <br />ing of final design criteria, preliminary drawings and <br />outline specifications. <br />1.3.3. Based on the information contained in the pre- <br />liminary design documents, submit a revised opinion <br />of probable Project Cosis. <br />1.3.4. Furnish five copies of the above preliminary <br />design documents and present and review them in per- <br />son with OWNER. <br />? <br />The duties and responsibilities of ENGINEER during <br />the Preliminary Design Phase are amended and supple- <br />mented as indicated in paragraph 3 of Exhibit A"Fur- <br />ther Description of Basic Engineering Services and <br />Related Matters". <br />1.4. Fnal Design Phase. <br />1.4.1. On the basis ofthe accepted preliminary design <br />documents and the revised opinion of probable Project <br />Cost, prepare for incorporation in the Contract Docu- <br />ments final drawings to show the character and extent <br />of the Project (hereinafter called "Drawings") and <br />Specifications. <br />1.4.2. Furnish to OWNER such documents and de- <br />sign data as may be required for, and assist in the <br />preparation of, the required documents so that <br />OWNER may apply for approvals of such governmen- <br />tal authorities as have jurisdiction over design criteria <br />applicable to the Project, and assist in obtaining such <br />approvals by participating in submissions to and ne- <br />gotiations with appropriate authorities. <br />1.4.3. Advise OWNER of any adjustments to the lat- <br />est opinion of probable Project Cost caused by changes <br />in extent or design requirements of the Project or Con- <br />struction Costs and furnish a revised opinion of prob- <br />able Project Cost based on the Drawings and Specifi- <br />cations. <br />1.4.4. Prepare for review and approval by OWNER. <br />his legal counsel and other advisors contract agreement <br />forms, general conditions and supplementary condi- <br />tions, and (where appropriate) bid forms, invitations <br />to bid and instructions to bidders, and assist in the <br />preparation of other related documents. <br />1.4.5. Furnish five copies of the above documents <br />and present and review them in person with OWNER. <br />The duties and responsibilities of ENGINEER during <br />the Final Design Phase are amended and supplemented <br />as indicated in paragraph 4 of Exhibit A"Further De- <br />scription of Basic Engineering Services and Related <br />Matters". <br />I.S. Bidding or Negotiating Phase. <br />Afier written authorization to proceed with the BiddinF <br />or Negotiating Phase, ENGINEER shall: <br />Page 2 of : ?.5 - pages
The URL can be used to link to this page
Your browser does not support the video tag.