My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
83-049 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
1983
>
83-049 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2014 12:36:32 PM
Creation date
12/26/2013 9:40:53 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
83-049
Legislation Date
6/7/1983
Year
1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
t ?f <br />Construction of C)wn Site Erosion Control <br />Crown Parificatiot Instrumentation Replacement <br />Baldwin Purificati, i Sludge Collection, Backwash Recirculation and Disposal Facilities Engineering <br />Construction of Dision Pumping Station Roadway and Site lmprovements <br />Construction of D•ision Pumping Station House Electrical Service <br />Construction of C)wn Heating Boiler Replacement <br />Construction of P, +ver Positioner in Parma Control Center <br />Construction of S( athwest Side Maintenance Yards <br />Purchase & Install tion of Hydrants, Valves & Pipe Replacement <br />Construction of N ttingham Plant Washwater Inlets <br />Baldwin Plant Wa iwater Pump Replacement <br />Construction of N N Distribution Mains <br />Purchase & lnstall tion of Remote Outside-Reading Meters <br />Construction of N ttingham Roofs <br />Crown Site Perimf er Fence <br />Construction of F,, irmount Pump Station Roof <br />Construction ot' Se :urity Facilities-All Locations <br />System Planning E igineer Report <br />Crown Intake Imp ovements <br />PHASE 2 <br />Construction of Baldwin Clearwell Joint Seals <br />System Hydraulic ;urvey Service <br />Construction of Independence Reservoir <br />Construction of Nottingham Roadway & Site Improvements <br />Constraction of Highland•Brecksville 3rd High Service Pump Station <br />Construction of Brecksville Reservoir <br />Construction of Brecksville Sapply Main <br />Remodel Lakeside Pump Station for Offices <br />Construction of Division Purification Settling Basin Bracing and Sealing <br />Construction of Phase I of New Division Filter Plant <br />Cleaning and Relir,ing Water Mains <br />Purchase and Instzllation of Hydrants, Valves & Pipe Replacement <br />Construction of New Distribution Mains <br />Purchase and Installation of Remote Outside Reading Meters <br />Construction of Se::urity Facilities-All Locations <br />PHASE 3 <br />Construction of N. ttingham Sludge Disposal Facilities <br />Replacement of Fi:.er Valves & Controls at Baldwin Water Plant <br />Construction of Nttingham Plant Coagulation Filtration and Reservoir Modification & Replacement <br />Construction of C)wn Sludge Collection and Disposal Facilities <br />Construction of Br ;dwin Sludge Facilities <br />Construction of P; mary Pmnping Station Transformer Coolant Containment Dikes <br />18
The URL can be used to link to this page
Your browser does not support the video tag.