My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
83-058 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
1983
>
83-058 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2014 12:36:34 PM
Creation date
12/26/2013 9:40:56 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
83-058
Legislation Date
5/17/1983
Year
1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
? <br />? <br />? <br />? <br />• D A L T O N ' D A L T O N N • N E W P O R T <br />City of North Olmsted <br />May 5, 1983 <br />Page Two <br />3. Furnish a Statement of Probable Construction Cost for the Reha- <br />bilitation Projects. <br />4. Furnish ten (10) copies of the Rehabilitation Project Drawings <br />and Specifications. <br />5. Amend the existing Step 3 Construction Grant Application on file <br />with Ohio EPA to fnclude the Rehabilitation Projects for federal <br />assistance. <br />6. Amend the existing Step 3 Construction Grant Application on file <br />with Ohio EPA to include the Rehabilitation Projects prepared by <br />Alex Ranareff and Associates for the City of Fairview Park, Ohio. <br />SPECIAL SERVICES <br />Dalton•Dalton•Newport shall provide Special Services for the <br />Project, when authorized in writing, in addition to those services <br />set forth in Basic Services. Such Special Services shall consist of: <br />l. Furnish engineering design services for the Rehabilitation Proj- <br />ects consistent with the Recommended Plan as described in the <br />referenced Sewer System Evaluation Survey. These Rehabilitation <br />Projects shall include rehabilitation of the existing sanitary <br />collection system in Olmsted Township consisting of approxi- <br />mately the following items as set forth in Exhibit "B,' attached <br />hereto and made a part hereof. <br />2. Furnish a Statement of Probable Construction Cost for the Reha- <br />bilitation Projects. <br />3. Furnish five (5) copies of the Rehabilitation Project Drawings <br />and Specifications. <br />4. Amend the existing Step 3 Construction Grant Application on file <br />with Ohio EPA to include the Rehabilitation Projects. <br />ADDITIONAL SERVICES <br />Dalton•Dalton•Newport shall provide services for the Project, <br />when authorized in writing, in addition to those services set forth <br />in Basic Services. Such services shall consist of providing any <br />other services not otherwise fncluded in this Agreement or not cus- <br />tomarily furnished in accordance with generally accepted engineering
The URL can be used to link to this page
Your browser does not support the video tag.