Laserfiche WebLink
<br /> <br />(c) Residential buildings, additions: <br />(1) Initial fee ...........................................................~ 25.00 <br />(2) Also usable floor area fee per 100 sq2. ft. in all stories......_.....$ 3.00 <br />(d) Residential buildings, accessory detached ara e: <br />(1) Initial fee ...........................................................$ 25.00 <br />(2) Also per 100 sq. ft. floor area .......................................$ 3.00 <br />(e) Residential buildings, alterations other than additions: <br />25 00 <br />(1) Initial fee ...........................................................$ <br />(2) Also per 100 sq. ft. floor area .......................................$ 3.00 <br />(f) Replacement of roofing and siding: <br />(1) Initial fee ............................................................$ 25.00 <br />(2) Also per 1,000 sq. ft. in excess of first 1,000 sq. ft .................$ 3.00 <br />(g) New driveways (asphalt and concrete) and patios: (in excess of 100 sq. ft.) <br />(1) Initial fee ............................................................$ 25.00 <br />(2) Also per 1,000 sq. ft. in excess of first 1,000 sq. ft ................. 3.00 <br />(h) Business or industrial building: <br />(1) Initial fee ...........................................................$500.00 <br />(2) Also per 100 sq. ft. of floor area.... ................................$ 6.00 <br />(i) Business or industrial building, appurtenances, additions and alterations: <br />(I) Initial fee ...........................................................$200.00 <br />(2) Also per I00 sq. ft. of floor area ...................................$ 3.50 <br />(j) Greenhouse not in excess of 400 sg• ft . ...................................$ 25.00 <br />(k) Greenhouse in excess of 400-sg.•ft:.•••••.• <br />(1) Initial fee..... .. ................................$ 40.00 <br />(2) Also per 100 sq. ft. of floor area ....................................$ 3.50 <br />(1) Raise or construct foundation walls for addition of basement :............$ 50.00 <br />( m) Demolition of buildings or sructures: <br />(I) I~p to 1000 sq. ft.. .................................................$ 50.00 <br />(2} Over 1000 sq. ft per 1000 sq. ft ......................................$ 5.00 <br />(n) Moving or buildings or structures: <br />(1) On or across of public thoroughfare ...................................$400.00 <br />(2) From one lot to another without moving oa a public thoroughfare.......$100.00 <br />(o) Outdoor sins and disnlap structures: <br />(1) Op to 50 sg. ft ............. ........_._........_...................5 50.00 <br />(2) For each sq. ft. over 50 sq.•ft .......................................$ 2.00 <br />( p) Fences <br />The erection-,..construction, alteration and installation of <br />fences within the City shall be in accordance with the <br />provisions of the City Ordinances and shall require the <br />