Laserfiche WebLink
4' ', . <br />(22) Water Heater or storage tank (150 to 500 gallons) .....................$ 4.00 <br />(23) Water Heater or storage tank (Over 500 gallons) .......................$ 5.00 <br />(24) Each water-connected air conditioning unit ............................$ 4.00 <br />(25) Each 100 lin. feet or fraction thereof building drain or <br />building sewer: <br />4, 5, or 6-inch diameter ..............................................$ 4.00 <br />8-inch diameter .......................................................$ 5.00 <br />10-inch diameter ......................................................$ 6.00 <br />12-inch diameter... .........................$ 7.00 <br />(26) Built-in incinerator ..................................................$ 5.00 <br />(27) Low temperature dehydrator portable incinerator .......................$ 3.00 <br />(28) Interceptor ...........................................................$ 4.00 <br />(29) Sewage ejector ........................................................$ 4.00 <br />(30) Lawn Sprinkler system .................................................$ 12.00 <br />(3I) Fire Sprinkler system .................................................$ 25.00 <br />(32) Catch Basin ...........................................................$ 4.00 <br />(33) Interceptor (grease) 1,000 gallons ....................................$ 30.00 <br />(34) Grease Trap ...........................................................$ 12.00 <br />(35) Sanitary Sewer Connection .............................................$ 35.00 <br />(36) Permit to install storm sewer: <br />(1) Initial fee ......................................................$ 15.00 <br />Per 100 lineal feet 4 inch to 6 inch ..................................$ 4.00 <br />Per 100 lineal feet 8 inch ............................................$ 5.00 <br />Per 100 lineal feet 10 inch ...........................................$ 6.00 <br />Per 100 lineal feet 12 inch ...........................................$ 7.00 <br />Per 100 lineal feet 16 inch ...........................................$ 9.00 <br />Per,100 lineal feet 18 inch ...........................................$ 12.00 <br />Per 100 lineal feet 24 inches and over ................................$ 14.00 <br />(37) Hot Tub Permit - Residential ..........................................$ 20.00 <br />Commercial ...........................................$ 25.00 <br />Additional ...........................................$ 10.00 <br />(c) Gas Piping (residential onl <br />The minimum fee for any permit to install gas piping shall be ..............$ 5.00 <br />to which shall be added for each outlet ....................................$ 2.00 <br />1321.04 ELECTRICAL LICENSE AND FEES <br />The following fee schedule shall prevail for all electrical work performed: <br />(a) Certificate of Reg istration <br />Reference is made to Codified Ordinance Section ~13I7.08 <br />(1) Registration fee (Calendar Year) .................... ........... ......$ 75.00 <br />(2) Renewal (If made by January 3I of following year of registration).....$ 50.00 <br />(b) Work to be performed <br />(1) Residential, new construction ....................... ..................$ 50.00 <br />(2) Residential, additions or alterations <br /> (a) Minimum fee .................................... ..................$ 15.00 <br />