My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
93-101 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
1993
>
93-101 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2014 3:46:12 PM
Creation date
1/9/2014 7:05:47 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
93-101
Legislation Date
9/22/1993
Year
1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
10.3 PAYMENTS ON ACCOUNT OF SASIC SERVICES <br />10.3.1 M initial payment as set forth in Paragraph 11.1 is the <br />minimum payment under this Agreement. <br />10.3.2 Subsequent payments for Basic Services shall be made <br />monthly and, where applicable, shall be in proponion co ser- <br />vices performed within each phase of service. <br />10.3.3 If and to che extent that the time initially established in <br />Subparagraph 11.5.1 of this Agreement is exceeded or ex- <br />cended through no fault of the Architect, compensation for any <br />services rendered during the additional period of time shall be <br />computed in the manner set fonh in Subparagraph 11.3.2. <br />10.3.4 When compensation is bascd on a percrntage of Con- <br />struction Cost and any portions of the Project are deleted or <br />otherwise not constructed, compensation for those portions of <br />the Project shall be payable to the extent services are per- <br />formed on those portions, in accordance with the schedule set <br />forch in Subparagraph 11.2.2, based on (I) the lowest bona fide <br />bid or negotiated proposal, or (2) if no such bid or proposal is <br />received, the most recent preliminary cstimate of Construction <br />Cost or detailed escimate of Construction Cost for such por- <br />tions of the Project. <br />10.4 PAYMENTS ON ACCOUNT OF ADDiTIONAL <br />SERVICES AND REIMBURSABLE DCPENSES <br />10.4.1 Payments on acmunt of the Architect's Addidonal Ser- <br />vices and for Reimbursable Expenses shall be made monthly <br />upon presentation of the Architect's statement of services <br />rendered or expenses incuned. <br />10.5 PAYMENTS WITHHELD <br />10.5.1 No deductions shall be made from the Architect's com- <br />pensation on account of sums withheld from payments to <br />contractors. <br />ARTICLE 11 <br />? BASIS OF COMPENSATION <br />The Owner shall compensa[e the Architect as follows: <br />11.1 AN INITIAL PAYMENT OF DoUars (s r... <br />shall be made upon execution of this Agreement and credited to the Owner's account at final payment. <br />11.2 BASIC COMPENSATION <br />11.2.1 FOR BAS1C SERVICES, as described in Article 2, and any other services included in Article 12 as part of Basic Services, Basic <br />Compensation shall be computed as follows: <br />(huco-t basis ojconrpenuarion, inUuding stipulated sums, mulriples or perceru{qes, and idcnrijyplxues to udiich particular metlwds oJoompensation apply, iJ necessary.) <br />1. The Master Plan updated thru input from the city Historical Society. <br />2. Construction Documents be completed for the entire project at one time. <br />3. Bidding and Construction to be done in Phases to best take advantage of <br />monies available as well as construction sequences. <br />Architectural (including mechanical and eletrical design) Fee Proposal. <br />Alterations to Master Plan $1,200 <br />Construction Documents 6,800 <br />* Bidding - Estimated (3 Biddings $800 x 3) 2,400 <br />* Construction - Estlmated (3 Biddings $1200 x 3) . 3,600 -- = <br />* The bidding and associated construction fees to be negotiated once <br />dollar amounts and scope of project is known. <br />11.2.2 Where compensation is based on a stipulated sum or percentage of Conswction Cost, progress paymenu for Basic Services <br />in each phase shall total the foilowing percentages of the tocal Basic Compensation payable: <br />(Guer-1 additronurl pbases as appropriale.) <br />Design Phase: $ 1,200 <br />Conswction Documents Phase: 6,800 <br />Construction Phase: ($Z, 400 Bi ddi ng Phdse ) 6,000 <br />Total Basic Compensation: ' one h <br />AIA DOCUMENT B151 • ABBRE\'IATED OVi'NER-ARCHITECT AGREEMENT • THIRD EDITlON • AIAe • O 1987 <br />THE AMERICAh INSTITUTE OF ARCNITECTS, 1735 NEW YORK AVENUE, N.Vi'., U'ASHINGTON, D.C. 20006 <br />percent ( 9 %) <br />percent (48 %) <br />percent (43 %) <br />undred percent (100%) <br />8151-1987 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.