Laserfiche WebLink
-2- <br />(iv) grading, draining, curbing, reconstructing the pavement base, preparing the <br />surface and paving with concrete, rehabilitating sewer service connections, constructing <br />sidewalks and driveway aprons, installing above-ground wires and cables for street lighting, <br />reconstructing water mains and water service connections where necessary, reconstructing <br />storm sewers where necessary, and constructing and reconstructing catch basins where <br />necessary in Coe Avenue; <br />(v) grading, draining, curbing, reconstructing the pavement base, widening, <br />preparing the surface and paving with concrete, constructing storm sewers and catch basins, <br />reconstructing sidewalks and driveway aprons, installing underground and above-ground wires <br />and cables for street lighting, reconstructing water mains and water service connections where <br />necessary, and reconstructing and rehabilitating sanitary sewers and sanitary sewer service <br />connections where necessary in Park Lane, Ambour Drive and Beech Lane; <br />(vi) grading, draining, curbing, reconstructing the pavement base, preparing the <br />surface and paving with concrete, reconstructing driveway aprons, constructing and <br />reconstructing catch basins, installing underground and above-ground wires and cables for <br />street lighting, reconstructing water mains, water service connections and sidewalks where <br />necessary, and reconstructing and rehabilitating sanitary sewers, sanitary sewer service <br />connections and storm sewers where necessary in Noreen Drive, Palm Drive and Birch Lane; <br />(vii) grading, draining, curbing, reconstructing the pavement base, preparing the <br />surface and paving with concrete, constructing and reconstructing catch basins, installing <br />above-ground wires and cables for street lighting, reconstructing water mains, water service <br />connections, storm sewers, sidewalks and driveway aprons where necessary, and <br />reconstructing and rehabilitating sanitary sewers and sanitary sewer service connections where <br />necessary in Hawkins Road; <br />(viii) grading, draining, curbing, reconstructing the pavement base, widening, <br />preparing the surface and paving with concrete, constructing storm sewers, catch basins, <br />sidewalks and driveway aprons, installing underground and above-ground wires and cables for <br />street lighting, reconstructing water mains and water service connections where necessary, and <br />reconstructing and rehabilitating sanitary sewers and sanitary sewer service connections where <br />necessary in Esther Avenue; <br />(ix) grading, reconstructing the pavement base, widening, paving with asphalt, <br />constructing and reconstructing storm sewers and catch basins, reconstructing and <br />rehabilitating sanitary sewers and sanitary sewer service connections where necessary, and <br />reconstructing sidewalks and driveway aprons where necessary in Alexander Road; <br />(x) grading, draining, curbing, reconstructing the pavement base, preparing the <br />surface and paving with concrete, constructing and reconstructing storm sewers and catch <br />basins, reconstructing sidewalks and driveway aprons, installing underground and above- <br />ground wires and cables for street lighting, reconstructing water mains and water service <br />connections where necessary, and reconstructing and rehabilitating sanitary sewers and sanitary <br />sewer service connections where necessary in Westchester Drive; <br />(xi) grading, draining, curbing, reconstructing the pavement base, preparing the <br />surface and paving with concrete, constructing and reconstructing storm sewers and catch <br />basins, reconstructing sidewalks and driveway aprons, installing underground and above- <br />ground wires and cable for street lighting, reconstructing water mains, water service <br />connections and sanitary sewer service connections where necessary, and reconstructing and <br />rehabilitating sanitary sewers where necessary in Olmsted Oval;