Laserfiche WebLink
4 <br />CITY OF NORTH OLMSTED <br />RESOLUTION N0.2011 - 55 <br />By: Mayor Kennedy <br />A RESOL UTION A UTHORIZING THE DIRECTOR OF PUBLIC SERVICE <br />TO ADVERTISE FOR BIDS FOR THE AWARD OF A CONTRACT TO <br />PROVIDE CONSTRUCTION SERVICES TO UPGRADE THE DOVER AND <br />LEBERN PUMP STATION CONTROLS nT C9~tA~~I9~'---%I'-n~ <br />711~JDDnilx']I~7x'AT? of ii1ACTL'Aj~AT~ TDL'AT]I~7~TT !'n7l ~'l=T741~I <br />zT -~=ca-rrz~ ~ <br />~~;~~-&, AS DETAILED IN THE SPECIFICATIONS ON FILE WITH <br />THE ENGINEER, AND AUTHORIZING THE MAYOR, FOLLOWING <br />APPROVAL OF THE BOARD OF CONTROL, TO CONTRACT FOR THE <br />SAME WITH THE LOWEST AND BEST BIDDER, AND DECLARING AN <br />EMERGENCY, AS AMENDED. <br />WHEREAS, the Dover and LeBern Pump Station control systems have had occasion to <br />fail, thereby increasing the risk of sewer back-up in the event of flooding, and prompting <br />additional monitoring and manpower to maintain operations; and <br />WHEREAS, the City has design specifications for the construction and installation of <br />improved pump station control systems~r-c~}~'~' <br />and has obtained financial assistance through the Ohio EPA and <br />scheduled this component of the project in consideration of same; and <br />WHEREAS, it is the desire of this Council to authorize the Director of Public <br />Safety/Service to advertise for bids for the award of a contract to upgrade and replace station <br />control systems at the Dover and LeBern Pump Stations, <br />^>>°~*~^r ~_~~*°~~~~, as recommended by previous studies and as set forth in specifications on file, <br />and to further authorize the Mayor, following approval by the Board of Control, to enter into a <br />contract with the lowest and best bidder. <br />NOW, THEREFORE, BE I T RESOLVED B Y THE COUNCIL OF THE CITY OF ` <br />NORTH OLMSTED, COUNTY OF CUYAHOGA, AND STATE OF OHIO: <br />SECTION 1: That the Director of Public Service be and he is hereby authorized to <br />advertise for bids for the award of a contract to construct and install pump station control systems <br />for the Dover and LeBern Pump Stations, as detailed in the specifications now on file with the <br />Engineer, and that the Mayor, following approval by the Board of Control, is hereby authorized <br />to execute a contract on behalf of the City with the lowest and best bidder. <br />SECTION 2: That this Resolution is hereby declared to be an emergency measure <br />immediately necessary for the preservation of the public health, safety and welfare, and further <br />for the reason that it is necessary that this Resolution go into effect immediately in order to <br />