Laserfiche WebLink
NextPage LivePublish <br />additional <br />Base Fee <br />to which shall be added the following charges: <br />A. Also, per receptacle, unit fixtures or outlet 2.00 <br />High intensity lighting outlets <br />B. Parking lot light fixtures (per pole) 40.00 <br />C. Outlets over 200 volts 25.00 <br />D. Power outlets: transformers, generators, <br />batteries (prim and second), rectifiers, electrostatic filters <br />and motors, including controls, distribution and connections <br />thereto, each: <br />Up to 1 HP 8.00 <br />Over 1 HP, up to 3 HP 9.50 <br />Over 3 HP, up to 6 HP 12.00 <br />Over 6 HP, up to 10 HP 16.00 <br />Over 10 HP, up to 15 HP 25.00 <br />Over 15 HP 28.00 <br />E. X-ray machine and equipment, each 35.00 <br />NOTE: For commercial permits whose total fee does not exceed $150.00, <br />the number of inspections shall be limited to four (underground, rough for <br />walls, rough for ceiling and final). <br />An additional charge shall be paid prior to any subsequent inspections <br />in the amount of: 35.00 <br />(Ord. 2002-192. Passed 12-17-02.) <br />1321.05 PERMIT CONDITIONS AND SPECIAL FEES. <br />(a) Permits issued under this fee schedule shall expire as follows: <br />(1) Homeowners permit - 3 months from the date of issuance. <br />(2) Building Permits as follows: <br />A. Under $25,000 evaluation - 4 months from date of issuance. <br />B. $25,001 -$100,000 evaluation - 6 months from date of issuance. <br />C. Over $100,001 evaluation - 9 months from date of issuance. <br />(3) Mechanical Permits as follows: <br />A. When no Building Permit is issued - 45 days or <br />B. To coincide with the expiration of the building permit. <br />Page 8 of 9 <br />(NOTE: Two extensions equal to the original time period allotted may be granted provided <br />http://www.conwaygreene.com/NorthOlmsted/lpext.dll/NorthOlmsted/56db/5 827/58f4?f=t... 4/ 12/2013