Laserfiche WebLink
? (h) Ventilation - Commercial <br />(1) Installation of new exhaust system for kitchen and cooking space, <br />' including duct, hood, and filters, each <br />(2) Replacement of Exhaust Fan <br />, (1) Duct or hood <br />, (2) Each additional unit <br />,(i) Residential exhaust fans, to include bathroom exhaust <br />1321.03 PLUMBING AND SEWER PERMIT FEES. <br />50.00 <br />40.00 <br />20.00 <br />35.00 <br />The following fee schedule shall prevail for all plumbing and sewer work to be performed. <br />(a) This base fee for any plumbing or sewer permit on a new construction and/or 40.00 <br />addition, alterations, to which shall be added the following charges for each unit ' <br />installed or altered: <br />' (b) Each fixture trap 4.00 <br />'(c) Sump Pump or Ejector 5.00 <br />(d) Water Heater or Storage Tank ' 10.00 <br />'(e) Each 100 Lineal Feet or Fraction thereof Building Drain or Sewer , 10.00 <br />(f) Oil Separator 12.00 <br />' (g) Sewage Ejectar , 12.00 <br />(h) Lawn Sprinkler System 30.00 <br />' (i) Catch Basin ' 8.00 <br />(j) Interceptor (grease) 1,000 gallons 60.00 <br />; (k) Grease Trap ' 30.00 <br />1321.04 ELECTRICAL PERMIT FEES. <br />The following fee schedule shall prevail for all electrical work to be performed: <br />, (a) Residential, new construction <br />_ (1) Under 1500 sq. ft. 100.00 <br />(2) Over 1500 sq. ft. . .. .125.00 <br />(b) Residential, additions, or alterations <br />. <br />(1) Base fee, plus: 50.00 <br />' (2) Per outlet and switches 3.00 <br />(3) Outlets over 200 volts ' 10.00 <br />(c) Commercial or industrial, new construction or addition <br />' (1) Base fee, plus: 75.00 <br />(2) Per outlet and switches <br />_ <br />_ ? 4.00 <br />(3) Parking lot _ light <br />fxtures (Per <br />Pole) _75.00 _ <br />(4) Outlets over 200 volts 50.00 <br />(5) Power outlets: transformers, generators, batteries (prime and second),