My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-041 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
2013
>
2013-041 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2014 3:50:47 PM
Creation date
12/26/2013 9:12:01 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2013-041
Legislation Date
6/26/2013
Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
? (h) Ventilation - Commercial <br />(1) Installation of new exhaust system for kitchen and cooking space, <br />' including duct, hood, and filters, each <br />(2) Replacement of Exhaust Fan <br />, (1) Duct or hood <br />, (2) Each additional unit <br />,(i) Residential exhaust fans, to include bathroom exhaust <br />1321.03 PLUMBING AND SEWER PERMIT FEES. <br />50.00 <br />40.00 <br />20.00 <br />35.00 <br />The following fee schedule shall prevail for all plumbing and sewer work to be performed. <br />(a) This base fee for any plumbing or sewer permit on a new construction and/or 40.00 <br />addition, alterations, to which shall be added the following charges for each unit ' <br />installed or altered: <br />' (b) Each fixture trap 4.00 <br />'(c) Sump Pump or Ejector 5.00 <br />(d) Water Heater or Storage Tank ' 10.00 <br />'(e) Each 100 Lineal Feet or Fraction thereof Building Drain or Sewer , 10.00 <br />(f) Oil Separator 12.00 <br />' (g) Sewage Ejectar , 12.00 <br />(h) Lawn Sprinkler System 30.00 <br />' (i) Catch Basin ' 8.00 <br />(j) Interceptor (grease) 1,000 gallons 60.00 <br />; (k) Grease Trap ' 30.00 <br />1321.04 ELECTRICAL PERMIT FEES. <br />The following fee schedule shall prevail for all electrical work to be performed: <br />, (a) Residential, new construction <br />_ (1) Under 1500 sq. ft. 100.00 <br />(2) Over 1500 sq. ft. . .. .125.00 <br />(b) Residential, additions, or alterations <br />. <br />(1) Base fee, plus: 50.00 <br />' (2) Per outlet and switches 3.00 <br />(3) Outlets over 200 volts ' 10.00 <br />(c) Commercial or industrial, new construction or addition <br />' (1) Base fee, plus: 75.00 <br />(2) Per outlet and switches <br />_ <br />_ ? 4.00 <br />(3) Parking lot _ light <br />fxtures (Per <br />Pole) _75.00 _ <br />(4) Outlets over 200 volts 50.00 <br />(5) Power outlets: transformers, generators, batteries (prime and second),
The URL can be used to link to this page
Your browser does not support the video tag.