Laserfiche WebLink
931.07 DRAINAGE OF HARD-SURFACED AREAS <br />Whenever the surface of a lot or plat is excavated, filled, graded or hard-surfaced with <br />impervious material, positive drainage shall be provided so that a nuisance will not be created. <br />Catch basins properly connected to storm sewers or other approved provisions, such as <br />underdrains, shall be made where water may pocket to preclude the accumulation of surface <br />water. Surface water shall not be drained onto adjacent properties not in the same ownership <br />without written permission from the owner of the adjacent property, and existing natural ground <br />drainage of the ground area surrounding the lot or plat excavated, filled or graded, shall not be <br />impeded. <br />931.08 WATER ACCUMULATION. <br />No condition shall be created nor any existing condition maintained whereby there will <br />be upon any lot or plot excavations, depressions, pits, holes, gullies or similar depressions which <br />may accumulate and retain surface water and which may become a public hazard or nuisance. <br />931.09 TOPOGRAPHIC MAP REQUIlZED. <br />(a) No building permit shall be issued until the topographic map for the parcel has been <br />approved by the City Engineer. The map or plan shall conform to the standards set by the City <br />Engineer. <br />? (b) Construction shall conform to the approved topographic map for the lot. No <br />significant deviation from the approved topographic plan shall be permitted without the submittal <br />of a revised topographic plan to the City Engineer for his review and approval prior to <br />construction of the deviation or revision. <br />(c) The builder shall submit to the City Engineer written verification that the purchaser of <br />the lot has reviewed the approved topographic plan for the lot prior to the issuance of the <br />building permit. In the event that there is no purchase contract at the time the building permit is <br />issued, the builder shall submit such verification within ten days of the date of the signing of a <br />contract to build a building on the lot. The verification shall be required to be submitted any time <br />that the City Engineer requires the submittal of a revised topographic plan. <br />(d) The builder shall submit to the City Engineer an "as-built" topographic plan for the lot <br />within thirty days of completion of the work, unless the City Engineer grants an extension due to <br />weather conditions. The City Engineer may also require submittal within thirty days of <br />notification of the builder of an "as-built" topographic plan for the lot if construction is not <br />completed but no substantial effort is made by the builder to complete the construction, in <br />accordance with the approved topographic plan, for a period of not less than ninety days. <br />(e) In the event that a builder does not submit an "as-built" topographic plan for a lot as <br />required in subsection (d) above, then the City may obtain the services of a registered surveyor to <br />perform a topographic survey and furnish the City Engineer with an "as-built" topographic plan