Laserfiche WebLink
Tiiis agreement may cover fihe following checklist for start-up and check of the heating <br />and air conditioning equipment: <br />1 - Check refrigerant charge. <br />2- Checfc for refrigerant leaks. <br />3- Check condensers and clean when needed. <br />4- Check condenser fan blades. <br />5- Check and tighten all electrical connections. <br />6- Checlc running amps and volts. <br />7- Check condensate drains, pans and lines for blockage. <br />8- Check blower belts for condition, tension and afignment. <br />9- Check and lubricate all bearings. <br />10 - Check blowers for cleanliness. <br />11- Check sight glass moisture indicator. <br />12 - Inspect all safety controis for proper operation. <br />13 - Check cooling and heating change-over controls. <br />14 - Inspect contactor contacts. <br />15 - Check, lubricate and adjust fresh air dampers. <br />16 - Inspect evaporator coils. <br />17 - Check compressor oil [evels where possible. <br />18 - Inspect starting and running controls. <br />19 - Check for vibration and noise. <br />20 - Inspect all relays. <br />21- Clean and adjust burners. <br />22 - Inspect flue piping. <br />23 - Clean and adjust pilots. <br />24 - Clean and adjust all controls. <br />25 - Inspect heat exchangers. <br />26 - Check overal[ operation. <br />27 - Brush indoor coils where needed.