My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-016 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
2006
>
2006-016 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2014 3:23:20 PM
Creation date
1/11/2014 4:50:32 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2006-016
Legislation Date
3/8/2006
Year
2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ordinance No. 2006-16 <br />(11) Flexibility: These standards are general guidelines and shall not limit the right <br />of the City of North Olmsted Engineer to impose at any time additional and/or more <br />stringent requirements nor shall the standards limit the right of the City of North <br />Olmsted Engineer to waive, in writing, individual requirements. <br />A) If the City of North Olmsted Engineer waives, in writing, individual <br />requirements the owner will provide the City of North Olmsted Engineer with the <br />information and documentation required to assure Ohio EPA that the waived <br />requirement will not degrade water quality. <br />928.09 APPLICATION PROCEDURES FOR POST-CONSTRUCTION WATER <br />QUALITY CONTROL PLANS: <br />(a) This plan will be combined with the Soil Erosion and Sediment Control, Storm <br />Water Management, Riparian Setback and Wetland Setback Plans that have also been developed <br />for the site. <br />(b) Plans developed by the site owners and approved by the City of North Olmsted in <br />accordance with this regulation do not relieve the site owner of responsibility for obtaining all <br />other necessary permits and/or approvals from federal, state, county, and local agencies and <br />departments. If requirements vary, the most stringent requirement shall be followed. <br />(c) Plans submitted to the City of North Olmsted Engineer for, review and approval, <br />shall be accompanied by other required permits and documentation relevant to the project, <br />including but not limited to the US Army Corps Of Engineers, Ohio EPA, ODNR Division of <br />Water and Ohio EPA NPDES Permit for Construction Activities <br />(d) Five (5) sets of the plans and necessary data required by this regulation shall be <br />submitted to the City of North Olmsted Engineer as follows: <br />(1) Format: <br />(A) Text material will be on 8.5 by 11 inch paper. <br />(B) Drawings will be on paper sized no larger than 24 inch by 36 inches. <br />(2) Construction protects <br />(A) At the preliminary plan approval request the preliminary plans shall show all <br />of the following existing and planned features: streams, water bodies, <br />wetlands, riparian and wetland setback areas permanent BMPs, storm water <br />management detention and retention basins. <br />(B) At the Improvement plan approval request. <br />(3) For general clearing projects: Thirty (30) working days prior to any soil-disturbing <br />activities. <br />(4) Permits List: A list of all the permits that will be needed from federal, state and local <br />agencies. <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.