Laserfiche WebLink
CITY OF NORTH OLMSTED <br />ORDINANCE N0. 79-49 <br />PAGE 4. <br />(36) Permit to install storm sewer <br />(1) Initial fee... <br />Per 100 lineal <br />Per 100 lineal <br />Per 100 lineal <br />Per 100 lineal <br />Per 100 lineal <br />Per 100 lineal <br />Per 100 lineal <br />feet <br />feet <br />feet <br />feet <br />feet <br />feet <br />feet <br />..................e......$ 7.00 <br />4 inch to 6 inch........ $ 3.00 <br />8 inch .................. $ 4.00 <br />10 inch ................. $ 5.00 <br />12 inch ................. $ 6.00 <br />16 inch ................. $ 8.00 <br />18 inch .................$10.00 <br />24 inches and over...... $12.00 <br />(c) Ga.s piping (residential only): <br />The minimLUn fee for any permit to install gas <br />piping shall be.... ...... ....................$ 3.00 <br />to which sha11 be aaaea?for each outlet ............. $ 1.00 <br />1321.03 HEATING, VENTILATING, AIR CONDITIONING AND REFRIGERATION <br />LICINSE FEES. <br />The following fee schedule sah11 prevail for all heating, ventilating, <br />air conditioning and refrigeration work to be performed: <br />(a) License. Reference is made to the Regional Dwelling <br />House Code, Section 1515.01 - "Registration, <br />Licensing and Certificates of Qua.lification - <br />General Provisions." <br />(1) Registration fee - Each Calendar Year........... $35.00 <br />(b) Heating eq_uipment. <br />(1) Each new heating installation: <br />A. To and including 150,000 Btuh ...............$16.50 <br />B. 151,000 Btuh, or more, per 1,000 Btuh, input$ .15 <br />C. In a single or two-family home, installation <br />for second or more heating units in same <br />building and ma.de at the same time.......... $11.00 <br />(2) Replacement of a boiler or furnace or other <br />central heating device, including any reQuired <br />alteration incidental thereto, for each unit.... $ 7.50 <br />(3) Installation of domestic-type portable <br />incinerator not exceeding two and one-half <br />cubic feet combustion chamber volwne............ $ 5.50 <br />(4) Installation of a gas burner or oi1 burner: <br />A. When part of an installation is made under <br />a permit issued pursuant to paragraph (b)(1), <br />(2) or (3) hereof ............................ none <br />B. Separate installation .. .....................$ 7.50 <br />(5) Any other alteration to a heating system........ $ 5.50 <br />(6) Installation of direct fuel unit heater, wa11 <br />heater, space heater or ceiling suspended unit <br />heater or electric heaters: <br />A. Each ... .....................................$ 8.75 <br />B. For each additional ceiling, electrical ox <br />unit heater.................................. $ 4.50 <br />(7) Other new installation than listed under this <br />schedule: <br />A. Installation of first unit .............. ....$16.50 <br />B. Installation of second or more units, each...$ 7.50 <br />(8) Other replacements than listed under this <br />schedule: <br />A. Replacement of first unit .................... $ 7.50 <br />B. Replacement of second or moxe units, each.... $ 4.50 <br />(9) Thru-wall sealed combustion heaters, not <br />exceeding 100,000 Btuh. input, each unit........ $ 7.50 <br />A. Each additional unit ..... ...................$ 3.25 <br />B. Replacement of sealed combustion apnlicance..$ 3.25