Laserfiche WebLink
,~~ ~ C <br />~ / <br /> <br />Engineer's Estimate of Cost <br />North Olmsted Industrial Parkway <br />June 7, 1988 <br />Page 3 <br />SUMMARY <br />Sanitary Sewer 5 136,109.00 <br />Storm Sewer 279,692.00 <br />Water Main 10,989.00 <br />Pavement 389,646,00 <br />General 53,794.00 <br /> 51,040,206.00 <br />Contingencies 75 394.Q0 <br />Estimate Canst. Cost 5 , <br />II ESTIAMTED FRf~JECT COST <br />Estiamte Construction Cost 51,115,600.00 <br />Legal 10,000.00 <br />Engineering Flan Preparation 54,000.00 <br />Engineering Construction <br />Layout 20 , 000.00 <br />Inspectit~n and Testing 37,000.00 <br />Financn~q <br />(1 year @ 68, ~ year @ 8$) 123,40fl.00 <br />Estimate8 Project Cost 51,360,000.00 <br />L~%~~ ~r~ <br />Alex Kanare .E. <br />Consulting Engineer <br /> <br />