My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/20/2005 Meeting Minutes
Document-Host
>
City North Olmsted
>
Minutes
>
2005
>
09/20/2005 Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2014 8:49:32 AM
Creation date
1/6/2014 9:02:33 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Date
9/20/2005
Year
2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Council Minutes of 9/28/2005 <br />purchasing items unless there are time restrictions or funding restrictions or risk that we need <br />® to make sure the city's interests are protected. The directors and division heads also have a <br />responsibility to ensure they are following the proper process and protecting the city's <br />interests. <br />2) She has submitted the information for the annual information filing that's due at the end of <br />September. It's a required filing that is done because of the debt that we hold. <br />3) She has been looking at the General Fund and with the budget a little more settled, it seems <br />there are some increased revenues with income tax collections through August, the additional <br />RTA payment that wasn't anticipated in the original budget and also interest rates that are <br />rebounding. These increased revenues are offset by some fees and permits, mostly in the <br />Building, Engineering and Planning permit areas that are behind plan. Since the majority of <br />the building season is close to the end, she does not expect those will meet their plan. She <br />expects about $300,000 over plan in the General Fund. Looking at expenditures, she didn't <br />find any major area other than what was discussed in the appropriations transfer that she felt <br />were really outrageous. There are no significant amounts of money that had been anticipated <br />to be spent but have not been spent. The expenditures will depend on the spending patterns <br />for the remainder of the year. We will probably end the year at expending 98% of the <br />budgeted amounts. She estimates the unencumbered. balance in the General Fund to be <br />approximately $400,000 to $600,004. It is important to remember we are not in control of <br />collecting the majority of our revenues. Also, the division heads are authorized to expend <br />100% of what's appropriated in their line items. So we have to rely on them to use good <br />judgment as well. <br />4) Revenue streams are going to be changing dramatically in the next couple of years for the <br />General Fund. Those issues will need to be discussed and decisions made. <br />Councilman Nashar, chairperson of the Streets & Transportation Committee: 1) The <br />committee met on September 13. Present were committee members Talton, Orlowski and <br />Nashar; President of Council Kennedy and Councilmen Miller, Barker, Gareau; Service <br />Director Driscoll, Human Resources Director Dailey, Safety Director Limpert, City Engineer <br />Durbin, Fire Chief Klecan and guests. Agenda items discussed were as follows: <br />• At the September 6 City Council meeting, Councilman Miller had addressed questions <br />with regards to and concerns about extending the rapid transit line into North Olmsted. <br />His concern was due to the increased cost of gasoline. Mr. Joe Calabrese, RTA <br />General Mgr., was invited to attend the committee meeting. Mr. Calabrese said just to <br />start and give consideration to such a proposal, it would take at least 10 to 15 years of <br />planning. In 1996, a study was proposed and the study did not meet the warrants and <br />does not meet them today for North Olmsted. We would have to have a demand such <br />as they have in Washington, D.C. and other large cities. The cost of this project would <br />be approximately $500 million. This does not include the operations costs. Mr. <br />Calabrese did say that plans are being addressed to expand the North Olmsted Park-n- <br />Ride, probably to start next year. <br />• Resolution 2005-127, a resolution authorizing the Mayor to submit an application to <br />the State of Ohio for Issue 2 Infrastructure Bond Program funding for Great Northern <br />Blvd. reconstruction from NOMBL Lane to Country Club Blvd. The count engineer's <br />projected cost is $1,441,000. The design costs from ODOT will be $140,0()0, and <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.