Laserfiche WebLink
FEE SUMMARY <br />PRELIMINARY DESIGN <br />GoIf Course Design. $ 8,500.Q0 <br />Irrigation Design $ 5,250.00 <br />Architecfixre Design $ 5,950.00 <br />7['otal fee for Preliminary Design Phase <br />FINAL DESIGN <br />Golf Course Design <br />Irrigation Design <br />Architecture Design <br />Total fee far Final Design Phase <br />BIDDING <br />Golf Course Design <br />Irrigation Design <br />Arcllitecture Design <br />Total fee for Bidding Phase <br />CONSTR UCTION <br />Golf Caurse Design <br />Irrigation Design <br />Architecture Design <br />Total fee for Construction Phase <br />$19,090.00 <br />$ 7,100.00 <br />$11,900.00 <br />$1,500.00 <br />$1,500.00 <br />$1,190.00 <br />$ 8,000.00 <br />$ 6,400.00 <br />$ 4,760.00 <br />RECORD DRAWINGS & COMPUTER PROGRAMMING <br />Golf course Design $2,500.00 <br />Irrigation Design $5,000.00 <br />Total fee for Drawings & Frogramming Phase <br />TO'TAL DESIGN FEE <br />$19,700.00 <br />$38,090.00 <br />$4,190.00 <br />$19,160.00 <br />$ 7,500.00 <br />$88,d40.00