Laserfiche WebLink
available plant knowledge. Any needs would be identified at the earliest possible <br />date. <br />The elapsed time can be reduced by one third. However, experiences with <br />similar studies have revealed that the limitation of time is often counter- <br />productive and reduces the opportunity for the author to interact informally with <br />the plant staff which will beneficiate the draft and final report. <br />Resumes ~" <br />The professional profile of the principal investigator Mr. Albertson is enclosed. <br />An experience summary of process evaluation and design experiences with the <br />No. Olmsted type of facility and effluent requirements is also enclosed. <br />Respectfully submitted, <br />O 's E. Albertson, PE, DEE <br />Process Consultant <br />OEA/tcj <br />6 <br />~;~ ~ , <br />