Laserfiche WebLink
sleeves, split collars, inlet flange and bearing and outlet housing and <br />bearing work for one of the five North Olmsted WWTP <br />mciroscreens; <br />3.1.2 Retrieve from the CONTRACTOR, without cost, each of the five <br />microscreen center support tubes having new center support tube <br />sleeves, the new support tube split collars, the new inlet support <br />flanges and bearings and the renovated outlet housings and bearings <br />after the modification, machining and repair services have been <br />rendered; and <br />3.1.3 Provide a written report on the performance of each reengineered, <br />modified and repaired center support tube, support tube sleeves, split <br />collars, inlet flange and bearing and outlet housing and bearing <br />following installation by the CITY and the need for additional <br />CONTRACTOR mechanical design work, if any, to the remaining <br />existing center support tubes, support tube sleeves, split collars, inlet <br />flange and bearing and outlet housing and prior to modification and <br />repair. <br />SECTION 4 - TIlVIE SCHEDULE <br />4.1 Unless otherwise directed by the. CITY, the CONTRACTOR shall <br />commence the performance of the Section 1 Basic Services of the Contractor upon <br />execution of this Agreement by both parties which shall constitute Authorization to <br />Proceed. <br />4.2 The CONTRACTOR recognizes that the services under this Agreement are <br />to be performed as expeditiously as practical. The CONTRACTOR shall make every <br />reasonable effort to substantially complete the Section 1 Basic Services of the Contractor <br />within the time set forth in Exhibit III, Time Schedule, attached hereto and made a part <br />hereof. <br />~. , ..~ d..~.. ~.~_ .. ..,,~ r._.p,.:.~ ,,:.~~. , _. <br />