Laserfiche WebLink
<br />Schools <br />elementary classrooms <br />other classrooms <br />Swimming Pools and Deck Areas <br />Trailer Homes <br />Vehicle Repair Areas <br />light repairs (batteries, mufflers, tires etc.) <br />major repairs (engine rebuilding, etc.) <br />paant spray areas <br />Warehouses or stock rooms <br />Ezplanatory Notes: <br />0.10 per 100 S.F. <br />0.12 per 100 S.F. <br />0.08 per 100 S.F. <br />0.80 per trailer <br />1.00 per Bay <br />2.00 per Bay <br />2.50 per Bay <br />0.03 per 100 S.F. <br />(1) This schedule establishes a ratio to a standard unit, that of a single-family residence, <br />for the purpose of calculating the sewer tap-in charge. The ratio multiplied by the item <br />measured (square foot, seat, bay, etc.) shall be calculated to the nearest one-tenth unit. <br />The tap-in charge will then be calculated by multiplying the number of benefited units by <br />the rate per unit applicable at such time. <br />(2) Uses not specifically listed shall be classified in accordance with the most similar listed <br />use. No reduction in square footage shall be made for fixtures or equipment. <br />(3) For a building with more than one use, the sewer tap-in charge shall be calculated <br />separately for each and summed for a total tap-in charge with the exception that: <br />(a) For non-simultaneous main uses such as found in school and church <br />facilities, as determined By the Service Director, each main use in the <br />facilities sha11 be separately calculated and the largest individual value <br />shall be used to calculate the fee. <br />(b) For minor accessory uses, such areas may be omitted from the calculations if it <br />is detennined that such areas do not have an adverse impact on the volume or type <br />of sewage flow. <br />(c) For a shell building, a base tap-in fee shall be charged for the entire building <br />based on the lowest tap-in ratio for a mixed use building. When a permit is issued <br />for interior plans, if the proposed use has a higher tap-in ratio, the additional fee <br />shall be paid at that time. <br />(4) When a building or portion of a building is changed from one use to another <br />additional tap-in fees will be charged if the new use has a higher tap-in ratio or will cause <br />an increase in the or amount of pollutants in the sewage. Failure to disclose the actual use <br />of the building or to disclose a change in use of the building will result in the levying of a <br />twenty-five percent surcharge in addition to the normal fee. <br />4 <br />? ,