Laserfiche WebLink
(e) For failure to maintain data and reports as required by this Agreement, <br />GRANTEE shall forfeit three hundred dollars ($300.00) per day that the <br />violation continues. <br />(fl The rights contained in this Section are, if applied, the sole and exclusive <br />remedy for such failures. No liquidated damages as described above <br />shall apply unless the, City has given the GRANTEE notice of any failure to <br />which liquidated damages applies and GRANTEE shall not have cured or <br />commenced to cure the failure within twenty (20) days of such notice. <br />Provided further, however, that the notice and cure period described <br />herein shall not apply to any failure by GRANTEE to timely file the report <br />described in Section XVII(A) above or to timely pay the franchise fee <br />reflected on such report as due. The hearing and appeal rights <br />described in Section VII, C, shall apply to liquidated damages described <br />herein. Further, liquidated damages, in the aggregate over the term of <br />this Agreement, may not exceed $25,000. <br />SECTION XXI <br />REMOVAL OF FACILITIES AND EQUIPMENT UPON REQUEST <br />Upon termination of service to any Subscriber, the GRANTEE shall promptly <br />remove all of its facilities and equipment from the premises of such Subscriber upon <br />written request. <br />SECTION XXII: <br />CONSTRUCTION PLAN; PROGRESS REPORTS <br />(a) The GRANTEE shall submit to the City all plans and specifications along <br />with a construction time table which is attached hereto as Exhibit 1. The time table <br />shall commence after required make-ready is completed. The GRANTEE shall also <br />provide a detailed geographical description of the various areas of the City to be <br />served. <br />(b) The GRANTEE shall furnish to the Mayor progress reports indicating in <br />detail the degree of construction or implementation of services. Such periodic reports <br />shall be made at (3) three months intervals. The first report shall be made (3) three <br />months from the start of construction. <br />29