Laserfiche WebLink
1 <br />Page 2 February 21, 1996 <br />City of North Olmsted <br />Attn: Mr. Paul Deichmann, P. E. <br />City Engineer <br />The rate for a Construction Observer is based on a normal eight (8) hour working day. <br />Any time over eight (8) hours on any given day or Saturday, Sunday and Holidays will be <br />charged at the overtime rate specified. No overtime will be charged for the Coordinating <br />Engineer. <br />Billings will be made on a monthly basis and payment is to be made within thirty (30) <br />days of billing date. . <br />We trust that this Proposal is responsive to your needs. Please indicate your acceptance <br />in the space provided below and retum one (1) copy of this Proposal to us. This shall then <br />constitute a contract between the City of North Olmsted and the W.R.E.S. Corporation. <br />Very truly yours, <br />The W.R.E.S. Co o tion <br />1 ? <br />. Howard Flower <br />President <br />JHF\rjw <br />JHF\071. cor <br />Accepted by: <br />Ed Boyle, PY10"r <br />Date: y 3 %%