Laserfiche WebLink
? <br />Page 3 January 15, 1996 <br />City of North Olmsted <br />? Attn: Mr. Ralph Bohlmann, <br />Service Director <br />? <br />E. LeBern Lift Station Service Area - North Olmsted Checklist <br />? F. Confined Space Entry Permit Training Certificates for WRES Personnel <br />? <br />III. TIlVIE SCHEDULE <br />? The inspection and evaluation will be completed within eight (8) weeks of authorization <br />to proceed. <br />IV. FEE SCHEDULE <br />We propose a fee for the above basic services of Twenty-Nine Thousand Siu Hundred <br />Dollars ($29,600.00). <br />IV. SUPPLEMENTARY SERVICES AND CHARGES <br />Not included in the fee for basic services are various supplementary services. These <br />supplementary services vary greatly in scope, complexity and timing. They may be a prominent <br />part of some engineering projects and not exist with others. Such supplementary services when <br />performed by the Engineer shall be paid at our prevailing per diem rates. When performed by <br />others, the charge will be at 1.1 times the actual cost to cover overhead. Supplementary <br />Services will not be performed unless agreed to by the City in writing. <br />1. Calculation of special assessments. <br />2. Procuring permits, easements or rights-of-way. <br />3. Additional services resulting from significant changes in the general scope of <br />design of the project. <br />4. Preparing for public hearing or attendance. <br />5. Specialized traffic studies. <br />6. Environmental impact statements.