Laserfiche WebLink
, <br />ARTICLE 5 ARTICLE 6 <br />CONSTRUCTION COST USE OF ARCHITECT'S DRAWINGS, <br />SPECIFICATIONS AND OTHER DOCUMENTS <br />5.1 DEFINITION <br />5.1.1 The Construction Cost shall bc the rotal cost or esti- <br />matcd cost to the Owncr of all clcmcnts of the Project dcsibncd <br />or specifed by the Architect. <br />5.1.2 Thc Construction Cost shall includc the cost at currcnt <br />markct ratcs of labor and matcrials furnishcd by the Owncr and <br />cyuipmcnt dcsigncd, spcciGcd, sc:lcctcd or spccially providcd <br />for by the ArchiCcct, plus a reasonablc allowancc for the Con- <br />tractoi s ovcncead and profit. In addition, a rcasonablc :dlow- <br />anrr for contInKcncics sh:dl lx incluclccl for markct conditions <br />at thc timc of bidding and for chanbcs in thc Work cluring <br />construction. <br />5.1.3 Construction Cost does not include the compensation of <br />the Architcct ancl Architcrt's consultants, the costs of the lancl, <br />rights-of•way, financing or c>thcr costs which :u•c thc resp>n- <br />siUility of the Owner as providcd in Articlc 4. <br />5.2 RESPONSIBILIl'Y FOR CONSTRUCTION COST <br />5.2.1 It is rccognized that ncidiec the Architect nor the Owner <br />has control ovcr the cost of IaUor, matcrials or equipmcnt, ovcr <br />the Contractor's mcthods of clctcrniining Uicl rriccs, or ovcr <br />rompxtitivc bictcling, markct or ncgoti:Uing con(litions. Accorcl- <br />ingly, the Architcct cannot and docs not warrant or rcprcscnt <br />that bids or negotiated prices will not vary from any cstimatc of <br />Conswction Cost or cvaluation prcparcd or agrccd to by thc <br />Architcct. <br />5.2.2 No fixed limit of Construction Cost shall bc cstablishcd <br />as a condition of this Agrccmcnt by the furnishing, proposal or <br />cstablishmcnt of a Projcct budgct, unlcss a fixcd limit has bccn <br />:igrrccl ulx)n in writing :incl signccl by the partics hcrcto. Fixcd <br />limits, if any, shall be incrr.iscd in thc :unownt of .ui incrcasc in <br />`thc Contract Sum occurring aftcr cxccution of the Contract for <br />Construction. <br />5.2.3 Any Projcct budgct or fixcd limit of Construction Cost <br />may bc adjustcd to rcflcct changcs in the gencral levcl of pricc:s <br />in the con.titruction industry bctwccn the datc of submission of <br />the Ctinstruction Documcnts to the Owncr and thc datc on <br />which proposals are soubht. <br />5.2.4 If a fixcd limit of Construction Cost is cxccc:dccl by thc <br />Icnvcst bona fide bid or negotiatcd proposal, the Owncr shall: <br />.1 givc writtcn approval of cun incrcasc in such fiaccl <br />limit; <br />.2 authorizc rcUidding or rcncgotiating of the Projcct <br />within a rcaxonablc timc; <br />.3 i( the Vrojcrt is :ihanclunccl, tcrminatc in accorclanc:c <br />with Par.igraph 8.3; or <br />.4 coopcr.uc in rcvising the Projcct scope and quality as <br />rcquircd to rcducc the Ccrostruction Cost. <br />5.2.5 If the Owner chooscs to procccd undcr Clausc 5.2.4•4, <br />the Architcct, without additional chargc, shall modify the Con- <br />tract Documcnts as ncccs.sary to comply with the fixcct limit, if <br />cstablishcct a.y a rimcliticm af thia A};rccmcnt. 'I'hc modilir.uion <br />uf Contract Dcxumcnts shall bc; the li?nit of thc Architcct's <br />responsibility arising out of the cstablishmcnt of a fixcd limit. <br />The Architect shall Ue entided to com}xnsation in accorcL•uicc <br />with this Agrcemcnt far aU xcviccs pcrformcd whcthcr or not <br />the Construction Pha.sc is commenced. <br />6.1 '1'hc Drawings, Spccilications :und othcr clocumcnts prc- <br />parca by the Architcct for this Projcct arc instrumcnts of thc <br />Architcct's scrvicc for usc solcly widi respect to this Projcct, <br />and the Architcct shall bc deemcd the audhor of these docu- <br />mcnts and shall retain all common law, statutory and othcr <br />reserved rights, including the copyright. The Owner shail be <br />pccmittcd to rctain copics, incluclinb rcproduciblc copics, of <br />thc Architcct's Drawings, Spccifications and othcr docwncnts <br />(or infonnation and refcrencc in conncction with dic Owncr's <br />usc :ind occu13-1111cy of thc Projcct. Thc Archiccct's Drawui};s, <br />Spccifications cx olhcr documcnts shall not bc uscd by thc <br />Owncr or othcrs on other projccts, for additions to this Project <br />or for complction of this Projcct by odhcrs, unlcss thc Architect <br />is adjudsed to bc in def:wlt under this Agrecmcnt, except by <br />agrccmcnt in writing ancl with appropri:uc compcnsation to thc <br />Archilcct. <br />6.2 SuUmission or discribution of documents to meet official <br />rcgulatory rcquiremcnts or for simi(ar purposcs in conncction <br />with the Projcct is not to bc construed as publication in dcroba- <br />tion o( thc Architcct's reserved rights. <br />ARTICLE 7 <br />ARBITRATION <br />7.1 Claims, disputcs or other matters in qucstion between the <br />partics to this Agrccmcnt arising out of or rc:L•uing to this Agrec- <br />ment or brcach thcreof shall Ue subject to and dccided by arbi- <br />tration in accordancc with the Consuvction Industry Arbitra- <br />tion Rulcs of the American Arbitration Association currently in <br />cffcct unlcss the partics mutualty agree otherwise. No arUitra- <br />tion arising out of or rclating to this Agreement shall includc, by <br />consolidation, joinder or in any other manner, an addition:il <br />pcrson or cntity not a party to this Agrcement, cxcept by writ- <br />tcn conscnt cont:iining a spccific rcfercncc to this Agrcement <br />signc:d by the Owner, Architcct, and any other pcrson or cntiry <br />sought to bc joincd. Consent to arbitr.uion involving an addi- <br />tion:d pcrson cx cntity shall not constitutc conscnt to arbitra- <br />tion oC :uny claim, disputc or othcr mattcr in qucstion not <br />describccl in thc written consent. 'I'hc foreboing agrecmcnt to <br />arbitratc :uid othcr abrccmenGS to arbitr.itc with an additional <br />pcrson or cntity dtdy conscntcd to by the partics to this Agrco- <br />nunt shall bc spccifirally cnforccable in accordancc with appli- <br />cablc law in any court having jurisdiction thcrcof. <br />7.2 In no cvcnt shall the demand for arbitration bc made aftcr <br />thc datc whcn institution of Icg:d or cquitablc procccclinp <br />b:Gtic(l on such daim, disputc or othcr mattcr in yucstion would <br />bc barrcd by the applicablc statutcs of limitations. <br />7.3 Thc awarcl rcnclcrccl by the arbi[rator or arbitr,uors shall bc <br />final, and juctgmcnt may bc cntcrcd upon it in accordancc with <br />applicablc law in any court having jurisdiction dlcrcof. <br />ARTICLE 8 <br />TERMINATION, SUSPENSION OR ABANDONMENT <br />8.1 This Agrecment may bc cerminatcd by eithcr party upon <br />not Icss than scven days' written nouce should the other party <br />AIA OOCUMENT 8151 • AISISREVIATED OWN[sK-AltClil'1'LCT AGIt1iGMliNT • TI IIRI) IiDI'1'ION • AIA° - D.C. <br />)6 <br />WARNING: Unllcensed photxopying violates U.S. copyright Iaws and is subject to Iegal prosecution.