My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
96-121 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
1996
>
96-121 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2014 10:12:15 AM
Creation date
1/21/2014 4:43:10 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
96-121
Legislation Date
7/24/1996
Year
1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />G & T ASSOCIATES, INC. <br />KIRAN C. PATEL, P.E., P.S. <br />Education: Bachelor of Engineering, Civil <br />Carleton University. Ottawa, Canada 1981 <br />MBA, Colgate Darden Graduate School of Bus. Adm. <br />University of Virginia, Charlottesville, VA 1989 <br />Experience: G& T Associates Inc., Strongsville, Ohio <br />Project Manager <br />Responsible for the design, analysis, field survey and/or construction inspection of various <br />projects including airport upgrades, bridge/roadway rehabilitation, and commercial site <br />development. Specific experience related to this project is as follows: <br />• Responsible for preparation of construction documents for replacement of bridges, <br />wideninfl and improvement of roadways, maintenance of traffic, and upgrading of <br />traffic signals and right-of-way plans for three ODOT projects and two City of <br />Cleveland projects. <br />• Design and preparation of complete site plans, including water, gas, storm, and <br />sanitary lines for a 13 unit subdivision in North Royalton OH. <br />• Preparation of site plan, including storm, sanitary, water, and electrical lines for <br />addition of new control center, Div. of Water, Parma Hts. <br />• Preparation of site plans, including all utilities for Shiva Vishnu Temple, Parma, OH. <br />• Preparation of construction documents for grading, draining pavement improvement <br />plans for Cedar, Smith, and S.Pleasant Streets, City of Oberlin. <br />• Preparation of drainage plans for reconstruction of Runway 5R-23L, reconstruction <br />plans for taxiway "L" and new perimeter roadway for CHIA. <br />• Design of approximately 4800 linear feet 12' water main and associated <br />appurtenances along SR 511 (Lorain Road) for the City of Oberlin. <br />• Relocation of 12" water main and preparation of complete roadway plans for W130th. <br />Street under Conrail Bridge for City of Cleveland. <br />• Preparation of final roadway, right-of-way, and waterline plans for replacement of the <br />Denison Ave. Bridge over Conraii and W.53rd St. at Train Ave. for City of Cleveland. <br />• Co-ordination of field survey works for Rockside Rd. between Broadview and <br />Brecksville Rds., Mayfield Rd. between Iroquois and Tower St.; Stearns-Crocker Rd. <br />between I-480 and Center Ridge Rd., Clague Rd. between Mastic and Lorain Rd., <br />Warrensville Rd. between Cedar and Mayfield Roads. <br />Reyistration: Professional Engineer - Ohio, Maryland, and Virginia <br />Professional Surveyor - Ohio <br />P-e\rirQirr..«ao.
The URL can be used to link to this page
Your browser does not support the video tag.