Laserfiche WebLink
. . <br />COST Of? PR1CE SU,ti1MARY FORMAT FOR SUBAGREE?r1ENT5 UNDER U.S. EPA GP.A*lTS Fo:: i.-?ij7?tOt'2d <br />(St•e accorr.pnnying rnstru:eionc before cor.*pletin_S this forr) G,;B .tio• ISS-R0144 <br />PAP.T I-GchEP.AL <br /> <br />. <br />1. GR?P.,TEE 2. GRAN' `Um3cR <br /> <br />C391665010 <br />City of North Olmsted _ <br />Nf.NE OF CONTRACTOR OR SUBCONTRACTOR <br />3 4. DATE OF P?OPOSAI. <br />. <br />Dalton•Dalton•Newport Inc November 29, 1978 <br />ADDRE55 OF GONTRACTOR OR SU9CONTRACTOR (Includr ZIP code) <br />S 6. TYPE OF SE4VIGE TO 8c FLi3N15"cZ <br />. <br />3605 Warrensville Center Road Consulting Engineering Services <br />Cleveland, Ohio 44122 For a Step 1 Facilities Plan <br />PART l1-C057 SUMMARY <br /> <br />7. OIRECT LABOR (Specify fabor ceteeorisn) <br />. ESTI- <br />MATED <br />HOURS MOURLY <br />? <br />RAT? ESTIMATEO <br />COST - TOTALS <br />Principals 150 s 21.90 S 3,285 i ? <br />Proj ect Manager 475 13.45 6,390 <br />Project Engineer 1135 11.24 12,755 % -s <br />Engineer Scientist 2130 9.74 20,745 <br /> 0 7.71 6,475 <br />esigners 5.00 2,725 <br />-_" • <br />` --?`- ?- <br />ec nica upport , . <br />375 <br />s 52 <br />DIREC7 LABOR TOTAL: ?:° •* ? - , <br /> <br />S. INOIRECT CO5T5 (Specify indirect coat pooTa) <br />RATE <br />* BASE _ ES'lM:. i cD <br />COST <br />a or Bur en 0.36 5 52,375 s 18,855 <br />enera Qver ead <br />1.02 <br />52,375 <br />53,420 <br /> <br />INDIRECT CO5T5 TOTAL: S 7Z 275 <br />9. OTHER DIRECT COSTS • ? ' ` ' <br /> ESTIMATED ' <br />a. TRAvEL COST - <br /> 850 ' <br />S) TFtANSPORTI.TION <br />5000 <br />• <br /> <br />5 <br />?'?. ? ,;-. . <br />?_'.. <br />_ <br />(Z) PER DIEM <br />7RAVEL SUBTOTAL: ?, • • ?-' S HSO . <br /> <br /> <br />ify eategories) Q7Y <br />b. EQUIPMENT, MATERIALS, SUPPLIES (Spec <br /> <br />COST ESTIMAT=D <br /> <br />COST - <br />izes 20 S 500 S 0 000 <br />Velocit robes - lease 3 500 1,500 <br />tt;*?g and b' d'n 25 a es <br />r <br />3 <br />-t 1.000 <br />. <br />, <br />? <br />,T <br />,t 500 _ <br />Cute <br />omp <br />EQUIPMENT SUBTOTAL• <br />13,000 . - <br /> ESTIMATcD <br />G.SUBCONTRACTS <br />. COST -` _ <br />.. i ., <br />Cit of North Olmsted -- sewer maintenance ersonnel for S 7,500 " <br />use in flow monitor maintenance and treatment lant <br />laborato ersonnel 5 7 500 ' <br />SUBCONTRACTSSUBTOTAL: <br /> ESTI?t%.'c0 <br />d. OTHER (Specify talegorirx) GCST <br /> S <br /> ? <br />OTMERSUBTOTAL: - •S <br />' OTHER DIRECT COSTS 707AL: <br />c 21?350 <br />. <br />` 5 146 OOO <br />D COST <br />T <br />I <br />MA <br />E <br />10. T7TAL EST <br />p 20 000 <br />=oFir <br />>>. <br />1 -- 166 000 <br />- - - - - - --- PAGt i vr a <br />E PA F orm 5700-I1 (2-76) <br />EXHIBIT "A"