Laserfiche WebLink
<br />ATTACHMEIVT "A" • <br />SR-10 <br />By applying an Asphalt Concrete irTed?e Course (?-12) in the curb <br />lane, both directions, on SR-10 (Lorain Road) Uetween SR-17 <br />(Brookpark Road) and the North Olmsted East Corporation Limit. <br />Length: 13,042 ft. ; Approxirnate Thickness : 0 to 3/4 inches; <br />Width: 12 ft. each side; Total Width of Wedge Course: 24 ft.; <br />Total Length: 2.47 miles. . <br />Pavement markings after comp]_etion of the work are the responsi- <br />bility of the city. <br />SR-252 <br />By applying an Asphalt Concrete Intermediate Course (403) and an <br />Asphalt Concrete Surface CoUrse (404) on SR-252 (Columbia Road) <br />between the North Olmsted South Corporation Limit and SR-17 <br />(Brookpark Road). Length: 8,184 z't.; Approximate Thickmess: 12 <br />inches; Width: 22 ft.; Total Length: 1.55 miles. Also the <br />shoulders will be reconditioned by doing shoulder preparation <br />and placing an Asphalt Concrete Shoulder Wedge Course (404). <br />Width: 3 ft.; Approximate.Thickness: 2 inches. . <br />Pavement markings after the completion of the work are the re- <br />sponsibility of the city. The Edge Lines are to be placed so as <br />to provide a 22 ft. pavement width and a 3 ft. shoulder on each <br />side. ,