Laserfiche WebLink
STORM 3~RS - DRAINAGE <br />• <br />63-83 To cooperate with Westlake and Bay Villageproblemsm water drainage <br />63-89 Authorizing engineer to study drainage problem - Beech Lane <br />63-99 Authorizing connection charge fnr storm drainage for land east <br />of Michael M. Varady Subdivision <br />63-112 Authorizing special counsel for acquisition of right of way for storm <br />sewer on Alexander Road <br />13:116 Levying special assessments for storm sewer on Decker <br />63-123 Authorizing acceptance of easement for Alexander storm sewer from t3rnbat <br />63-157 Providing for $26,620 bonds for Decker storm sewer, etc. <br />63-2Z3 Authorizing instllation of culvert material on Lansing (Milkap, Inc.) <br /> <br /> <br /> <br />-: <br />