My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-017 Resolution
Document-Host
>
City North Olmsted
>
Legislation
>
2014
>
2014-017 Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2014 3:53:07 PM
Creation date
3/27/2014 3:53:06 PM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2014-017
Legislation Date
2/18/2014
Legislation Title
Grusenmeyer Amended Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
§3.6.4.4 Subject to the provisions of Section 4.3,the Architect shall review and respond to requests for information <br /> about the Contract Documents.The Architect shall set forth in the Contract Documents the requirements for requests <br /> for information.Requests for information shall include,at a minimum,a detailed written statement that indicates the <br /> specific Drawings or Specifications in need of clarification and the nature of the clarification requested.The <br /> Architect's response to such requests shall be made in writing within any time limits agreed upon,or otherwise with <br /> reasonable promptness.If appropriate,the Architect shall prepare and issue supplemental Drawings and Specifications <br /> in response to requests for information. <br /> §3.6.4.5 The Architect shall maintain a record of submittals and copies of submittals supplied by the Contractor in <br /> accordance with the requirements of the Contract Documents. <br /> §3.6.5 CHANGES IN THE WORK <br /> §3.6.5.1 The Architect may authorize minor changes in the Work that are consistent with the intent of the Contract <br /> Documents and do not involve an adjustment in the Contract Sum or an extension of the Contract Time.Subject to the <br /> provisions of Section 4.3, the Architect shall prepare Change Orders and Construction Change Directives for the <br /> Owner's approval and execution in accordance with the Contract Documents. <br /> §3.6.5.2 The Architect shall maintain records relative to changes in the Work. <br /> §3.6.6 PROJECT COMPLETION <br /> §3.6.6.1 The Architect shall conduct inspections to determine the date or dates of Substantial Completion and the date <br /> of final completion;issue Certificates of Substantial Completion;receive from the Contractor and forward to the <br /> Owner,for the Owner's review and records,written warranties and related documents required by the Contract <br /> Documents and assembled by the Contractor;and issue a final Certificate for Payment based upon a final inspection <br /> indicating the Work complies with the requirements of the Contract Documents. <br /> §3.6.6.2 The Architect's inspections shall be conducted with the Owner to check conformance of the Work with the <br /> requirements of the Contract Documents and to verify the accuracy and completeness of the list submitted by the <br /> Contractor of Work to be completed or corrected. <br /> §3.6.6.3 When the Work is found to be substantially complete,the Architect shall inform the Owner about the balance <br /> of the Contract Sum remaining to be paid the Contractor,including the amount to be retained from the Contract Sum, <br /> if any,for final completion or correction of the Work. <br /> §3.6.6.4 The Architect shall forward to the Owner the following information received from the Contractor: (1)consent <br /> of surety or sureties,if any,to reduction in or partial release of retainage or the making of final payment; <br /> (2)affidavits,receipts,releases and waivers of liens or bonds indemnifying the Owner against liens;and(3)any other <br /> documentation required of the Contractor under the Contract Documents. <br /> §3.6.6.5 Upon request of the Owner,and prior to the expiration of one year from the date of Substantial Completion, <br /> the Architect shall,without additional compensation,conduct a meeting with the Owner to review the facility <br /> operations and performance. <br /> ARTICLE 4 ADDITIONAL SERVICES <br /> §4.1 Additional Services listed below are not included in Basic Services but may be required for the Project.The <br /> Architect shall provide the listed Additional Services only if specifically designated in the table below as the <br /> Architect's responsibility,and the Owner shall compensate the Architect as provided in Section 11.2. <br /> (Designate the Additional Services the Architect shall provide in the second column of the table below.In the third <br /> column indicate whether the service description is located in Section 4.2 or in an attached exhibit.If in an exhibit, <br /> identiji.'the exhibit) <br /> Init. AIA Document 8101",—2007 tformerty 8151'"-1997).Copyright 61974,1978,1987,1997 and 2007 by The American Institute of Architects.All rights <br /> reserved.WARNING:This AIA'Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of 8 <br /> this AIA'Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under <br /> the law.This document was created on 06/12/2013 11:07:04 under the terms of AIA Documents-on-DemandTM order no. 2008611102 ,and is not for <br /> resale.This document is licensed by the American Institute of Architects for one-time use only,and may not be reproduced prior to its completion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.