Laserfiche WebLink
§4.3 Additional Services may be provided after execution of this Agreement,without invalidating the Agreement. <br /> Except for services required due to the fault of the Architect,any Additional Services provided in accordance with this <br /> Section 4.3 shall entitle the Architect to compensation pursuant to Section 11.3 and an appropriate adjustment in the <br /> Architect's schedule. <br /> §4.3.1 Upon recognizing the need to perform the following Additional Services,the Architect shall notify the Owner <br /> with reasonable promptness and explain the facts and circumstances giving rise to the need.The Architect shall not <br /> proceed to provide the following services until the Architect receives the Owner's written authorization: <br /> .1 Services necessitated by a change in the Initial information,previous instructions or approvals given by <br /> the Owner,or a material change in the Project including,but not limited to,size,quality,complexity, <br /> the Owner's schedule or budget for Cost of the Work,or procurement or delivery method; <br /> .2 Services necessitated by the Owner's request for extensive environmentally responsible design <br /> alternatives,such as unique system designs,in-depth material research,energy modeling,or LEED/ <br /> certification; <br /> .3 Changing or editing previously prepared Instruments of Service necessitated by the enactment or <br /> revision of codes,laws or regulations or official interpretations; <br /> .4 Services necessitated by decisions of the Owner not rendered in a timely manner or any other failure of <br /> performance on the part of the Owner or the Owner's consultants or contractors; <br /> .5 Preparing digital data for transmission to the Owner's consultants and contractors,or to other Owner <br /> authorized recipients; <br /> .6 Preparation of design and documentation for alternate bid or proposal requests proposed by the Owner; <br /> .7 Preparation for,and attendance at,a public presentation,meeting or hearing; <br /> .8 Preparation for,and attendance at a dispute resolution proceeding or legal proceeding,except where the <br /> Architect is party thereto; <br /> .9 Evaluation of the qualifications of bidders or persons providing proposals; <br /> .10 Consultation concerning replacement of Work resulting from fie or other cause during construction;or <br /> .11 Assistance to the Initial Decision Maker,if other than the Architect. <br /> §4.3.2 To avoid delay in the Construction Phase,the Architect shall provide the following Additional Services,notify <br /> the Owner with reasonable promptness,and explain the facts and circumstances giving rise to the need.If the Owner <br /> subsequently determines that all or parts of those services are not required,the Owner shall give prompt written notice <br /> to the Architect,and the Owner shall have no further obligation to compensate the Architect for those services: <br /> .1 Reviewing a Contractor's submittal out of sequence from the submittal schedule agreed to by the <br /> Architect; <br /> .2 Responding to the Contractor's requests for information that are not prepared in accordance with the <br /> Contract Documents or where such information is available to the Contractor from a careful study and <br /> comparison of the Contract Documents,field conditions,other Owner-provided information, <br /> Contractor-prepared coordination drawings,or prior Project correspondence or documentation; <br /> .3 Preparing Change Orders and Construction Change Directives that require evaluation of Contractor's <br /> proposals and supporting data,or the preparation or revision of instruments of Service; <br /> .4 Evaluating an extensive number of Claims as the Initial Decision Maker; <br /> .5 Evaluating substitutions proposed by the Owner or Contractor and making subsequent revisions to <br /> Instruments of Service resulting therefrom;or <br /> .6 To the extent the Architect's Basic Services are affected,providing Construction Phase Services 60 <br /> days after(I)the date of Substantial Completion of the Work or(2)the anticipated date of Substantial <br /> Completion identified in Initial Information,whichever is earlier. <br /> §4.3.3 The Architect shall provide Construction Phase Services exceeding the limits set forth below as Additional <br /> Services.When the limits below are reached,the Architect shall notify the Owner: <br /> .1 ( )reviews of each Shop Drawing,Product Data item,sample and similar submittal <br /> of the Contractor <br /> .2 ( )visits to the site by the Architect over the duration of the Project during construction <br /> .3 ( )inspections for any portion of the Work to determine whether such portion of the <br /> Work is substantially complete in accordance with the requirements of the Contract Documents <br /> .4 ( )inspections for any portion of the Work to determine final completion <br /> §4.3.4 . . . . • _ . .• • • - -, . - • <br /> AIA Document 81017°—2007(formerly 8151 TM—1997).Copyright 61974,1978,1987,1997 and 2007 by The American Institute of Architects.All rights <br /> /nit. <br /> reserved.WARNING:This AIA Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of 10 <br /> this AIA"Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under <br /> the law.This document was created on 06/12/2013 11:07:04 under the terms of AIA Documents-on-Demandlu order no. 2008611102 ,and is not for <br /> resale.This document is licensed by the American Institute of Architects for one-time use only,and may not be reproduced prior to its completion. <br />