My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2014-61
Document-Host
>
City North Olmsted
>
Legislation
>
2014
>
Resolution 2014-61
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2014 8:28:30 AM
Creation date
9/16/2014 11:42:10 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2014-61
Legislation Date
9/2/2014
Legislation Title
Bids Waste Water Treatment Plant Roof
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
E. Guarantees: Coping and gravel stop systems shall be provided with twenty year <br />performance guarantees relative to blow -off, leaktightness and finish. <br />PART 3 -- EXECUTION <br />3.01 INSTALLATION - GENERAL <br />A. Install roof accessories and specialties in accordance with the manufacturer's instructions. <br />Provide a complete watertight and weatherproof installation. Install with provision for <br />expansion and contraction. <br />3.02 DAMAGED MATERIAL <br />A. Repair or replace materials damaged during installation. <br />3.03 ADJUSTING AND CLEANING <br />A. Check levels and adjust as necessary after roofing and flashing is complete. <br />B. Protect materials from damage by other trades. Remove protective coatings at completion of <br />project. <br />- END OF SECTION - <br />30048 - 005.812312012 07700 -3 North Olmsted Phase 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.