Laserfiche WebLink
Contractor's Price Proposal -Detail Continues.. <br /> Work Order Number: 031536.00 \\ <br /> Work Order Title: City of North Olmsted VWVfP Dem Interior Tank&Concrete Pads <br /> Sect. Item Modifer UOM Description // Line Total <br /> Labor Equip. Material (Excluded if marked with an X <br /> General Conditions <br /> 26 01 22 23 00 0140 WK Up To 2,000 CFM Portable Negative Air Machine With Pre-Filter And HEPA $493.86 <br /> Filter <br /> Quantity Unit Price Factor Total <br /> Installation 2 00 x 230.00 x 1.0736 = 493.86 <br /> 2 week rental for negative air machine in work area <br /> 27 01 56 16 00 0007 SF 6 Mil Plastic Anti Static And Fire And Flame Retardant Sheeting,Applied To $652.75 <br /> Walls <br /> Quantity Unit Price Factor Total <br /> Installation 1,600.00 x 0.38 x 1.0736 = 652.75 <br /> 20'H x 80 LF=1,600 SF separation of work area. <br /> 28 01 56 16 00 0011 EA 7'Zipper Door For Plastic Sheeting $46.98 <br /> Quantity Unit Price Factor Total <br /> Installation 2 00 x 21.88 x 1.0736 = 46.98 <br /> 2 Zipper doors to allow access to work area&garage area. <br /> 29 01 71 13 00 0002 EA Equipment Delivery,Pickup,Mobilization And Demobilization Using A Rollback $1,296.82 <br /> Flatbed Trucklncludes delivery of equipment,off loading on site,rigging, <br /> dismantling,loading and transporting away.For equipment such as trenchers, <br /> skid-steer loaders(bobcats),industrial warehouse forklifts,sweepers, <br /> scissor platform lifts,telescoping and articulating boom manlifts with up to 40' <br /> boom lengths,etc. <br /> Quantity Unit Price Factor Total <br /> Installation 6.00 x 201.32 x 1.0736 = 1,296.82 <br /> Mobilization of 3 scissor lifts,1 skid steer,1 hydraulic hammer attachment,1 forklift attachment. <br /> 30 01 71 13 00 0003 EA Equipment Delivery,Pickup,Mobilization And Demobilization Using A Tractor $432.26 <br /> Trailer With Up To 53'Bedlncludes delivery of equipment,off loading on site, <br /> rigging,dismantling,loading and transporting away.For equipment such as <br /> bulldozers,motor scrapers,hydraulic excavators,gradalls,road graders, <br /> loader-backhoes,heavy duty construction loaders,tractors,pavers,rollers, <br /> bridge finishers,straight mast construction forklifts,telescoping boom rough <br /> terrain construction forklifts,telescoping and articulating boom manlifts with <br /> >40'boom lengths,etc. <br /> Quantity Unit Price Factor Total <br /> Installation 100 x 402.63 x 1.0736 = 432.26 <br /> Mobilize excavator <br /> 31 01 74 19 00 0017 EA 40 CY Dumpster(5 Ton)"Construction Debris"Includes delivery of dumpster, $2,452.06 <br /> rental cost,pick-up cost,hauling,and disposal fee.Non-hazardous material. <br /> Quantity Unit Price Factor Total <br /> Installation 4 00 x 570.99 x 1.0736 = 2,452.06 <br /> 1 Scrap Dumpster,2 C&D Dumpster;1 Concrete Dumpster-Interior concrete removal.173.5 CF x 150 Ibs/cy <br /> =13 Tons <br /> 32 01 74 19 00 0017 0006 MOD For Each Ton Over Indicated Amount,Add $386.50 <br /> Quantity Unit Price Factor Total <br /> Installation 8.00 x 45.00 x 1.0736 386.50 <br /> 8 tons(13 tons-5 tons)over for concrete disposal. <br /> Subtotal for General Conditions $5,761.23 <br /> Sect. Item Modifer UOM Description Line Total <br /> Labor Equip. Material (Excluded if marked with an X <br /> New Concrete Slab <br /> Contractor's Price Proposal-Detail Page 4 of 8 <br /> EZIQC-Ohio 6/5/2015 <br />