Contractor's Price Proposal -Detail Continues..
<br /> Work Order Number: 031536.00 \\
<br /> Work Order Title: City of North Olmsted VWVfP Dem Interior Tank&Concrete Pads
<br /> Sect. Item Modifer UOM Description // Line Total
<br /> Labor Equip. Material (Excluded if marked with an X
<br /> General Conditions
<br /> 26 01 22 23 00 0140 WK Up To 2,000 CFM Portable Negative Air Machine With Pre-Filter And HEPA $493.86
<br /> Filter
<br /> Quantity Unit Price Factor Total
<br /> Installation 2 00 x 230.00 x 1.0736 = 493.86
<br /> 2 week rental for negative air machine in work area
<br /> 27 01 56 16 00 0007 SF 6 Mil Plastic Anti Static And Fire And Flame Retardant Sheeting,Applied To $652.75
<br /> Walls
<br /> Quantity Unit Price Factor Total
<br /> Installation 1,600.00 x 0.38 x 1.0736 = 652.75
<br /> 20'H x 80 LF=1,600 SF separation of work area.
<br /> 28 01 56 16 00 0011 EA 7'Zipper Door For Plastic Sheeting $46.98
<br /> Quantity Unit Price Factor Total
<br /> Installation 2 00 x 21.88 x 1.0736 = 46.98
<br /> 2 Zipper doors to allow access to work area&garage area.
<br /> 29 01 71 13 00 0002 EA Equipment Delivery,Pickup,Mobilization And Demobilization Using A Rollback $1,296.82
<br /> Flatbed Trucklncludes delivery of equipment,off loading on site,rigging,
<br /> dismantling,loading and transporting away.For equipment such as trenchers,
<br /> skid-steer loaders(bobcats),industrial warehouse forklifts,sweepers,
<br /> scissor platform lifts,telescoping and articulating boom manlifts with up to 40'
<br /> boom lengths,etc.
<br /> Quantity Unit Price Factor Total
<br /> Installation 6.00 x 201.32 x 1.0736 = 1,296.82
<br /> Mobilization of 3 scissor lifts,1 skid steer,1 hydraulic hammer attachment,1 forklift attachment.
<br /> 30 01 71 13 00 0003 EA Equipment Delivery,Pickup,Mobilization And Demobilization Using A Tractor $432.26
<br /> Trailer With Up To 53'Bedlncludes delivery of equipment,off loading on site,
<br /> rigging,dismantling,loading and transporting away.For equipment such as
<br /> bulldozers,motor scrapers,hydraulic excavators,gradalls,road graders,
<br /> loader-backhoes,heavy duty construction loaders,tractors,pavers,rollers,
<br /> bridge finishers,straight mast construction forklifts,telescoping boom rough
<br /> terrain construction forklifts,telescoping and articulating boom manlifts with
<br /> >40'boom lengths,etc.
<br /> Quantity Unit Price Factor Total
<br /> Installation 100 x 402.63 x 1.0736 = 432.26
<br /> Mobilize excavator
<br /> 31 01 74 19 00 0017 EA 40 CY Dumpster(5 Ton)"Construction Debris"Includes delivery of dumpster, $2,452.06
<br /> rental cost,pick-up cost,hauling,and disposal fee.Non-hazardous material.
<br /> Quantity Unit Price Factor Total
<br /> Installation 4 00 x 570.99 x 1.0736 = 2,452.06
<br /> 1 Scrap Dumpster,2 C&D Dumpster;1 Concrete Dumpster-Interior concrete removal.173.5 CF x 150 Ibs/cy
<br /> =13 Tons
<br /> 32 01 74 19 00 0017 0006 MOD For Each Ton Over Indicated Amount,Add $386.50
<br /> Quantity Unit Price Factor Total
<br /> Installation 8.00 x 45.00 x 1.0736 386.50
<br /> 8 tons(13 tons-5 tons)over for concrete disposal.
<br /> Subtotal for General Conditions $5,761.23
<br /> Sect. Item Modifer UOM Description Line Total
<br /> Labor Equip. Material (Excluded if marked with an X
<br /> New Concrete Slab
<br /> Contractor's Price Proposal-Detail Page 4 of 8
<br /> EZIQC-Ohio 6/5/2015