Laserfiche WebLink
(b) Residential, additions, or alterations <br /> (1) Base fee, plus: 50.00 <br /> (2) Per outlet and switches 2.00 <br /> (3) Outlets over 200 volts, panels, disconnects, and meter bases, each 1.0.00 <br /> (4) Power outlets: transformers, generators, batteries (prime and second), <br /> rectifiers, electrostatic filters and motors, including controls, distribution <br /> and connections thereto, each: <br /> Up to 1 HP 12.00 <br /> Over 1 HP, up to 15 HP 25.00 <br /> Over 15 HP 35.00 <br /> (c) Commercial or industrial, new construction or addition <br /> (1) Base fee,plus: 75.00 <br /> (2) Per outlet and switches 2.50 <br /> (3) Parking lot light fixtures (per pole) 50.00 <br /> (4) Outlets over 200 volts, panels, disconnects, and meter bases, each 3:0015.00 <br /> r sforfimers, o , m , <br /> rectifiers(5) Powe, electrostatic outlets: traniters and generat motors, including rsbatteries controls(prie and, distribution second) <br /> and connections thereto, each: <br /> Up to 1 HP 12.00 <br /> Over 1 HP, up to 15 HP 25.00 <br /> Over 15 HP 35.00 <br /> (6)X-ray machine and equipment, each 45.00 <br /> (7) Fire alarm control panel, initiating, and annunciating device, each 2.50 <br /> 1321.05 PLANS EXAMINATION FEES. <br /> For work requiring the examination of plans, the following fee schedule shall prevail. Plan <br /> review fees under paragraphs (a), (b), (e,) (f) and (g) below shall be paid at the time of <br /> building permit application. <br /> (a) Single family residential; new construction, additions and alterations 90.00 <br /> (b) Multiple family residential, commercial and industrial; new construction, <br /> additions and alterations; temporary structures over 2,000 sq. ft. including <br /> temporary tent and fabric structures <br /> (1) Base fee 150.00 <br /> (2)Plus per 100 sq. ft. 4.00 <br /> (c) Review of plans not approved per occurrence +50% <br /> (d) Review of nonconforming plans per occurrence +25% <br /> (e) Review of shop drawings (fire alarm, sprinklers, kitchen exhaust hoods, 120.00 <br /> HVAC etc.) • . <br /> (1) Plus per 100 sq. ft. for first 10,000 sq. ft. 4.00 <br /> (2) Plus per 100 sq. ft. for area over 10,000 sq. ft. 2.00 <br /> (f) Review of changes submitted after plans are approved (commercial) 400 <br /> (1) Base fee 95.00 <br /> (2) Plus per 100 sq. ft. of area affected by the change 2.00 <br />