Laserfiche WebLink
(c) If the grading account of an individual builder diminishes below fifty percent (50%) of the <br />required deposit, the builder shall be required to deposit additional funds to bring his account up <br />to the required deposit. The City Engineer may issue a stop work order if additional funds are not <br />deposited within seven days of the notice to make such deposit. When a builder has completed <br />all work on a building and final grading has been inspected and approved by the City, the builder <br />shall be refunded whatever the remaining balance may be remaining in his grading account. <br />(d) If corrective work ordered by the City Engineer is not done within thirty days from the time <br />of the sending of written notice by the City, the City may do the work, and the aforesaid cash <br />deposit shall be applied to the cost of the City doing the aforesaid grading. Any funds which are <br />in excess of the City's cost of grading shall be returned to the individual making the deposit as <br />aforesaid; and further, any deficiency in funds between the deposit and the cost of the City doing <br />the grading shall become a lien upon the lands and shall be certified to the Auditor of the County <br />for entering upon the tax duplicate and collection as other taxes and shall be returned by the <br />Auditor of the County to the City for deposit in the General Fund of the City. <br />Exhibit A <br />