Laserfiche WebLink
EXHIBIT A: EXISTING CHAPTER 928 <br />66R-19 Post Construction Storm Water Management Regulations 928.13 <br />A. Security Bond, Escrow Account, Verified Check or Cash shall be <br />deposited with the City of' -\-0 <br />f North Olmsted prior to review by the <br />City of North Olmsted Engineer and/or its consultants to cover <br />professional services of the City of North Olmsted Engineer, <br />Building Commissioner, Zoning Inspector and/or other experts <br />required by the City of North Olmsted Engineer, City of North <br />Olmsted Council, Mayor or Review Boards. <br />B. No soil disturbing activities shall be permitted until a Security <br />Bond, Escrow Account, Verified Check or Cash has been posted to <br />the satisfaction of the City of North Olmsted Engineer sufficient <br />for the City of North Olmsted to perform the obligations otherwise <br />to be performed by the owner or person responsible for the <br />development area as stated in this regulation, and to allow all work <br />to be performed as needed in the event that the owner or person <br />responsible for the development area fails to comply with the <br />provisions of this regulation. The Security Bond, Escrow Account, <br />Verified Check or Cash shall be released only after all work <br />required by this regulation has been completed to the satisfaction <br />of the City of North Olmsted Engineer and all permit and <br />inspection fees required by these regulations have been paid in full. <br />C. No project subject to this regulation shall commence without the <br />Soil Erosion and Sediment Control, and Storm Water <br />Management, and Water Quality Plans having been approved by <br />the City of North Olmsted Engineer. <br />(2) Performance guarantee. The furnishing of a performance guarantee will <br />be maintaine in a deposit amount of not less than 120% of the estimate <br />approved by the City Engineer of installation of the improvements. <br />(3) Maintenance -guarantee. The maintenance guarantee shall be maintained <br />for a period of not less than (two) 2 years after final acceptance of the <br />stone water, soil erosion, sediment control, and water quality practices in <br />an amount equal to 20% of the deposit required for the Performance <br />Guarantee. <br />(4) Time extension. The City of North Olmsted Engineer may extend the <br />time allowed for the installation of the improvements for which the <br />performance guarantee has been provided with the receipt of a written <br />request from the owner. <br />(5) Completion. Upon completion of the construction of improvements or <br />temporary and/or permanent, soil erosion, sediment control, and water <br />quality practices and the removal of the temporary soil erosion, sediment <br />control, and water quality practices for which the performance guarantee <br />has been provided the owner shall notify the City of North Olmsted <br />Engineer of this fact. <br />(6) Inspection. The City of North Olmsted will not release the Security Bond, <br />Escrow Account, Verified Check or Cash guarantee until the City of North <br />Olmsted Engineer has inspected the site to ensure that the guaranteed <br />item(s) have been completed and/or removed. <br />(7) Release. The Construction Maintenance Guarantee shall not be released <br />by the City of North Olmsted until all temporary soil erosion and sediment <br />control practices that are no loner needed have been removed, properly <br />disposed of and any trapped sediment has been stabilized. <br />(Ord. 2012-27. Passed 10-2-12.) <br />