My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-096 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
2016
>
2016-096 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2017 10:42:28 AM
Creation date
11/8/2016 10:14:44 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2016-096
Legislation Date
11/1/2016
Year
2016
Legislation Title
New Chapter 927 to Meet New and Updated Ohio EPA Requirements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT B: NEW CHAPTER 927 <br />permanent erosion control on areas where construction operations are complete or where <br />no further disturbance is expected for at least one year. <br />6j) PERSON: Any individual, corporation, firm, trust, commission, board, public or private <br />partnership, joint venture, agency, unincorporated association, municipal corporation, <br />county or state agency, the federal government, other legal entity, or an agent thereof. <br />(kk) PHASING: Clearing a parcel of land in distinct sections, with the stabilization of each <br />section before the clearing of the next. <br />(11) POINT SOURCE: Any discernible, confined and discrete conveyance, including but not <br />limited to, any pipe, ditch, channel, tunnel, conduit, well, discrete fissure, container, <br />rolling stock, concentrated animal feeding operation, landfill leachate collection system, <br />vessel or the floating craft from which pollutants are or may be discharged. This term <br />does not include return flows from irrigated agriculture or agricultural stormwater runoff. <br />(mm) PRE -CONSTRUCTION MEETING: A meeting between the City of North Olmsted and <br />all principle parties, prior to the start of any construction, at a site that requires a <br />Stormwater Pollution Prevention Plan. <br />(nn) PRF -WINTER STABILIZATION MEE'T'ING: A meeting between the City of North <br />Olmsted and all principal parties, prior to October 1, in order to plan winter erosion and <br />sediment controls for a site that requires a Stormwater Pollution Prevention Plan. <br />(oo) PROFESSIONAL ENGINEER: A Professional Engineer registered in the State of Ohio. <br />(pp) QUALIFIED INSPECTION PERSONNEL: A person knowledgeable in the principles <br />and practice of erosion and sediment controls, who possess the skills to assess all <br />conditions at the construction site that could impact stormwater quality and to assess the <br />effectiveness of any sediment and erosion control measure selected to control the quality <br />of stormwater discharges from the construction activity. <br />(qq) RAINWATER AND LAND DEVELOPMENT: Ohio's standards for stormwater <br />management, land development, and stream protection. The most current edition of these <br />standards shall be used with this regulation. <br />(rr) RIPARIAN AREA: The transition area between flowing water and terrestrial (land) <br />ecosystems composed of trees, shrubs and surrounding vegetation which serve to <br />stabilize erodible soil, improve both surface and ground water quality, increase stream <br />shading and enhance wildlife habitat. <br />(ss) RUNOFF: The portion of rainfall, melted snow, or irrigation water that flows across the <br />ground surface and is eventually conveyed to water resources or wetlands. <br />(tt) RUNOFF COEFFICIENT: The fraction of rainfall that will appear at the conveyance as <br />runoff. <br />
The URL can be used to link to this page
Your browser does not support the video tag.