My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-096 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
2016
>
2016-096 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2017 10:42:28 AM
Creation date
11/8/2016 10:14:44 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2016-096
Legislation Date
11/1/2016
Year
2016
Legislation Title
New Chapter 927 to Meet New and Updated Ohio EPA Requirements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT B: NEW CHAPTER 927 <br />i. The required sediment storage and <br />dewatering volumes <br />ii. The provided sediment storage and <br />dewatering volumes <br />iii. The weir length or skimmer size, as <br />applicable <br />iv. The weir length or skimmer size provided <br />viii. Data sheets for all sediment traps, sediment basins, and <br />SCMs that identify contributing drainage area, disturbed <br />area, water quality volume, sedimentation volume, <br />dewatering volume, practice surface area, facility discharge <br />and dewatering time, outlet type and dimensions, and any <br />other relevant parameters for each practice. <br />ix. A separate plan and profile view of each individual <br />sediment settling pond and its outlet structure. Detail <br />drawings of the outlet structure shall indicate the following <br />elevations: <br />a) Pond bottom <br />b) Elevation required to store the required sediment <br />storage volume <br />c) For sediment basins, the elevation at which the <br />skimmer is attached <br />d) For sediment traps, the top and bottom of the stone <br />outlet section <br />e) Elevation required to store the dewatering volume, <br />exclusive of the sediment storage volume <br />f) Elevation of the top of embankment <br />g) Crest of the emergency spillway <br />X. Where used as a sediment -settling pond during <br />construction, the plan shall include a detail drawing of the <br />temporary outlet configuration of the permanent storm <br />water basin with the following information specified: <br />a) Storage volume provided below the elevation at <br />which the skimmer or other surface dewatering <br />device is attached <br />b) Elevation at which the skimmer or other surface <br />dewatering device is attached <br />c) Elevation at which the full dewatering zone is <br />stored above the skimmer invert <br />d) Any temporary modification to permanent outlet <br />orifices or weirs required to ensure no discharge <br />below the skimmer invert and only the skimmer <br />controls the discharge up to the top of the <br />
The URL can be used to link to this page
Your browser does not support the video tag.