My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-096 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
2016
>
2016-096 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2017 10:42:28 AM
Creation date
11/8/2016 10:14:44 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2016-096
Legislation Date
11/1/2016
Year
2016
Legislation Title
New Chapter 927 to Meet New and Updated Ohio EPA Requirements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT B: NEW CHAPTER 927 <br />included in the report and approved by the City Engineer shall be <br />incorporated in the grading plans and/or other specifications for site <br />development. <br />A. Data regarding the nature, distribution, strength, and erodibility of <br />existing soils. <br />B. If applicable, data regarding the nature, distribution, strength, and <br />erodibility of the soil to be placed on the site. <br />C. Conclusions and recommendations for grading procedures. <br />D. Conclusions and recommended designs for interim soil <br />stabilization devices and measures, and for permanent soil <br />stabilization after construction is completed. <br />E. Design criteria for corrective measures when necessary. <br />F. Opinions and recommendations covering the stability of the site. <br />927.09 PERFORMANCE STANDARDS <br />The SWP3 must contain a description of the controls appropriate for each construction operation <br />and the applicant must implement such controls. The SWP3 must clearly describe for each major <br />construction activity the appropriate control measures; the general sequence during the <br />construction process under which the measures will be implemented; and the contractor <br />responsible for implementation (e.g., contractor A will clear land and install perimeter controls <br />and contractor B will maintain perimeter controls until final stabilization). <br />The approved SWP3, and the sediment and erosion controls, and non -sediment pollution controls <br />contained therein, shall be implemented upon the commencement of construction. Perimeter <br />controls must be installed two working days prior to commencement of construction. The <br />approved plan must be implemented until the site reaches final stabilization. All properties <br />adjacent to the site of soil -disturbing activity shall be protected from soil erosion and sediment <br />run-off and damage, including, but not limited to, private properties, natural and artificial <br />waterways, wetlands, storm sewers and public lands. <br />It is the owner's responsibility to maintain current records of contractor(s) responsible for <br />implementing the SWP3 and providing that information to the City Engineer. The SWP3 shall <br />identify all subcontractors engaged in activities that could impact stormwater runoff. The SWP3 <br />shall contain signatures from all of the identified subcontractors indicating that they have been <br />informed and understand their roles and responsibilities in complying with the SWP3. The <br />applicant shall review the SWP3 with the primary contractor prior to commencement of <br />construction activities and keep a SWP3 training log to demonstrate that this review had <br />occurred. <br />
The URL can be used to link to this page
Your browser does not support the video tag.