My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-19 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
2017
>
2017-19 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2017 10:51:30 AM
Creation date
2/23/2017 10:57:55 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2017-19
Legislation Date
2/21/2017
Year
2017
Legislation Title
Amend Chapter 1321 Permit and Inspection Fees
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1321.03 PLUMBING AND SEWER PERMIT FEES. <br />The following fee schedule shall prevail for all plumbing and sewer work to be performed. <br />(a) This base fee for any plumbing or sewer permit on a new construction and/or <br />addition, alterations, to which shall be added the following charges for each unit <br />i25.00 <br />installed or altered: <br />(1) Base fee, plus: <br />(1) Residential <br />40.00 50.00 <br />(2) Commercial <br />60 00 75.00 <br />(b) Each fixture trap <br />4.00 <br />(c) Sump Pummor Ejector _—_ _ <br />5.00 <br />(d) Water Heater or Storage Tank <br />10.00 <br />(e) Each 100 Lineal Feet or Fraction thereof Building Drain or Sewer <br />10.00 <br />(f) Oil Se arator - - - -- --- -- <br />12.00 <br />(g) Sewage E e tar <br />12.00 <br />(h) Lawn Sprinkle stem <br />30.00 <br />(i) Catch Basin <br />8.00 <br />Interceptor ( ease) 1,000 gallons _ <br />60.00 <br />k Grease Trap <br />30.00 <br />(1) Air Admittance Valve, each <br />10 00 <br />1321.04 ELECTRICAL PERMIT FEES. <br />The following fee schedule shall prevail for all electrical work to be performed: <br />(2) Ovef r i cnn ft <br />( Residential, new construction, additions, or alterations <br />i25.00 <br />(1) Base fee, plus: <br />50.00 <br />_ <br />2 Per outlet and switches <br />2.00 <br />(3) Outlets over 200 volts, panels disconnects, and meter bases, each <br />10.00 <br />(4) Power outlets: transformers, generators, batteries (prime and second), <br />rectifiers, electrostatic filters and motors, including controls, distribution <br />and connections thereto, each: <br />Up to 1 HP <br />12.00 <br />Over 1 HP, up to 15 HP <br />25.00 <br />Over 15 HP35.00 <br />(EtCommercial or industrial, new construction or addition <br />---- ------ --- <br />(1) Base fee,lluus_ - - -- -- --- - – - - <br />-75.0 __ j <br />2 Per outlet and switches <br />2.50 <br />5000 <br />15.00 <br />_ <br />(3) Parking lot light fixtures (per pole) <br />(4) Outlets over 200 volts, panels, disconnects, and meter bases, each <br />(5) Power outlets: transformers, generators, batteries (prime and second), <br />rectifiers, electrostatic filters and motors, including controls, distribution <br />and connections thereto, each: <br />Up to 1 HP <br />12.00 <br />Over 1 HP, up to 15 HP <br />25.00 <br />Over 15 HP <br />35.00 <br />machine and equipment, each — <br />45.00 <br />_- – <br />(7) Fire alarm control panel, initiating, and annunciating device, each <br />2.50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.