Laserfiche WebLink
1321.03 PLUMBING AND SEWER PERMIT FEES. <br />The following fee schedule shall prevail for all plumbing and sewer work to be performed. <br />(a) This base fee for any plumbing or sewer permit on a new construction and/or <br />addition, alterations, to which shall be added the following charges for each unit <br />i25.00 <br />installed or altered: <br />(1) Base fee, plus: <br />(1) Residential <br />40.00 50.00 <br />(2) Commercial <br />60 00 75.00 <br />(b) Each fixture trap <br />4.00 <br />(c) Sump Pummor Ejector _—_ _ <br />5.00 <br />(d) Water Heater or Storage Tank <br />10.00 <br />(e) Each 100 Lineal Feet or Fraction thereof Building Drain or Sewer <br />10.00 <br />(f) Oil Se arator - - - -- --- -- <br />12.00 <br />(g) Sewage E e tar <br />12.00 <br />(h) Lawn Sprinkle stem <br />30.00 <br />(i) Catch Basin <br />8.00 <br />Interceptor ( ease) 1,000 gallons _ <br />60.00 <br />k Grease Trap <br />30.00 <br />(1) Air Admittance Valve, each <br />10 00 <br />1321.04 ELECTRICAL PERMIT FEES. <br />The following fee schedule shall prevail for all electrical work to be performed: <br />(2) Ovef r i cnn ft <br />( Residential, new construction, additions, or alterations <br />i25.00 <br />(1) Base fee, plus: <br />50.00 <br />_ <br />2 Per outlet and switches <br />2.00 <br />(3) Outlets over 200 volts, panels disconnects, and meter bases, each <br />10.00 <br />(4) Power outlets: transformers, generators, batteries (prime and second), <br />rectifiers, electrostatic filters and motors, including controls, distribution <br />and connections thereto, each: <br />Up to 1 HP <br />12.00 <br />Over 1 HP, up to 15 HP <br />25.00 <br />Over 15 HP35.00 <br />(EtCommercial or industrial, new construction or addition <br />---- ------ --- <br />(1) Base fee,lluus_ - - -- -- --- - – - - <br />-75.0 __ j <br />2 Per outlet and switches <br />2.50 <br />5000 <br />15.00 <br />_ <br />(3) Parking lot light fixtures (per pole) <br />(4) Outlets over 200 volts, panels, disconnects, and meter bases, each <br />(5) Power outlets: transformers, generators, batteries (prime and second), <br />rectifiers, electrostatic filters and motors, including controls, distribution <br />and connections thereto, each: <br />Up to 1 HP <br />12.00 <br />Over 1 HP, up to 15 HP <br />25.00 <br />Over 15 HP <br />35.00 <br />machine and equipment, each — <br />45.00 <br />_- – <br />(7) Fire alarm control panel, initiating, and annunciating device, each <br />2.50 <br />