My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-027 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
2017
>
2017-027 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2017 10:55:22 AM
Creation date
3/23/2017 3:33:46 PM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2017-027
Legislation Date
3/21/2017
Year
2017
Legislation Title
John Patrick Picard Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
nC <br />JOHN PATRICK <br />PICARD <br />ARCHITECT INC. <br />113 LINCOLN WAY WEST, MASSILLON, OHIO 44647 <br />PHONE: (330) 471-9000 <br />February 27, 2017 <br />Mr. Chris Wetmore <br />Assistant Recreation Commissioner <br />North Olmsted Parks and Recreation <br />26000 Lorain Road <br />North Olmsted, Ohio 44070 <br />Reference: Architectural Services Proposal <br />Dear Mr. Wetmore, <br />EXHIBIT <br />a A <br />Thank you for the opportunity to offer my architectural services in the roofing project associated <br />with the tennis court/gymnastics facility roof <br />The project includes the re -roofing of the tennis court and gymnastics portion of the North <br />Olmsted Recreation Center. The project also includes the removal of the batt insulation attached <br />to the underside of the roof and the painting of the underside of the roof structure. <br />The following is a cursory description of the services included in this proposal. <br />Architectural Services Include: <br />• Field measuring to verify and document existing conditions <br />• Development of existing conditions documents <br />o Roof plan <br />o Reflective ceiling plan <br />o Building sections (2 are required) <br />• Research and study of viable roofing systems and options for the removal of the <br />underside roof insulation and refinishing of roof deck <br />• Construction budget estimate for selected approach to re -roofing and interior ceiling <br />renovation <br />• Development of construction documents for competitive bidding and associated meetings <br />• Coordination with code officials (Building, and Fire). <br />• Construction and contract administration services <br />o Two pre-bid meetings <br />o Development/administration of any needed addendums <br />o Bid review and development of contract <br />o Pre -construction meeting <br />o Weekly job progression meetings <br />o Administration of contract <br />
The URL can be used to link to this page
Your browser does not support the video tag.