My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-033 Resolution
Document-Host
>
City North Olmsted
>
Legislation
>
2017
>
2017-033 Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2017 10:52:48 AM
Creation date
3/23/2017 3:29:59 PM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2017-033
Legislation Date
3/21/2017
Year
2017
Legislation Title
Lorain Road Traffic Signalization Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(Ordinance No. 206.124) PID No. 95108 <br />ODOT Project No. (2017) <br />FINAL RESOLUTION <br />The following Final Resolution enacted by the City of North Olmsted, Ohio, hereinafter <br />referred to as the Legislative Authority/Local Public Agency or "LPA", in the matter of the <br />stated described project. <br />WHEREAS, on 15th day of November, 2016, the LPA enacted legislation proposing <br />cooperation with the Director of Transportation for the described project: <br />The project consists of the upgrade of traffic signals and signal system along <br />Lorain Road (SR 10), lying within the City of North Olmsted; and <br />WHEREAS, the LPA shall cooperate with the Director of Transportation in the above <br />described project as follows: <br />The City agrees to assume and bear one hundred percent (100%) of the entire <br />cost of the improvement, less the amount of Federal -Aid CMAQ funds set aside <br />by the Director of Transportation for the financing of this improvement from <br />funds allocated by the Federal Highway Administration, U.S. Department of <br />Transportation, and further, the City agrees to assume and bear 100% of the <br />cost of Preliminary Engineering and Right -of -Way, excluding in-house <br />preliminary engineering and right of way charges incurred by the State. <br />The share of the cost of the LPA is now estimated in the amount of Eight Hundred <br />Fifteen Thousand Four Hundred Thirty Eight and - - - - 00/100 Dollars, <br />($815,438.00), but said estimated amount is to be adjusted in order that the LPA's <br />ultimate share of said improvement shall correspond with said percentages of actual <br />costs when said actual costs are determined; and <br />WHEREAS, The Director of Transportation has approved said legislation proposing <br />cooperation and has caused to be made plans and specifications and an estimate of cost <br />and expense for improving the above described highway and has transmitted copies of <br />the same to this legislative authority; and <br />WHEREAS, The LPA desires the Director of Transportation to proceed with the <br />aforesaid highway improvement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.