My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-034 Resolution
Document-Host
>
City North Olmsted
>
Legislation
>
2018
>
2018-034 Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2018 10:55:23 AM
Creation date
4/6/2018 10:52:30 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2018-034
Legislation Date
4/3/2018
Year
2018
Legislation Title
Brewer-Garrett Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
D <br />Brewer -Garrett <br />6800 EASTLAND ROAD <br />MIDDLEBURG HEIGHTS, OH 44130 <br />440.243-3535 <br />PROPOSAL <br />NORC Date: 2/27/2018 <br />26000 Lorain Road <br />North Olmsted, Ohio 44070 Project: Perma Frost Piping Repairs <br />Attn: Chris Wetmore <br />Scope of Work <br />EXHIBIT <br />a <br />After the Ice Show, customer will take down the ice sheet and Brewer Garrett will provide the <br />following tasks. This work is based on the current conditions and any additional problems will be <br />addressed as found. <br />Enlarge pit under the stands to provide an easier underground water path. <br />Use air handler unit(York) and space heaters to raise space temperature. Locate space heaters to <br />provide "even" heat across the heave area. <br />This should make the headers drop to their correct elevation as the heaved ice melts. <br />Remove sand around headers to investigate insulation. <br />Repair insulation as required. <br />Complete underfloor (under ice) heating system repairs, if required and accessible. <br />If the header drops and some repairs points are visible in the under -sand insulation (and repairs <br />completed) , rebuild the ice. <br />COST........................................................................ ..............................................$32,000.00 <br />IF THE HEADERS DON'T DROP AFTER HEAVE ICE IS MELTED: <br />It looks like the heaving has spread to under the boa rds/score r's/bench area and at the concrete floor <br />in the mechanical room. Removal of concrete above the header piping in these areas may be required <br />to thaw and allow the headers to drop to the required elevation. We may want to think about doing <br />this removal SOONER rather than later (be proactive). This concrete could be removed in the <br />mechanical room before the ice is taken down. <br />COST.............................................................................................................................. $18,000.00 <br />A FACILITY SOLUTIONS COMPANY <br />
The URL can be used to link to this page
Your browser does not support the video tag.