Laserfiche WebLink
facility, with all electric meters, concealment elements, telecommunications <br />demarcation boxes, grounding equipment, power transfer switches, cut-off switches, <br />and vertical cable runs for the connection of power and other services clearly <br />labeled. <br />3. Method of installation/connection to pole or ground, as applicable. <br />4. Color specifications for all small cell support structures and associated exposed <br />equipment, cabinets and concealment elements. <br />5. Electrical plans and wiring diagrams <br />6. Footing and foundation drawings and structural analysis sealed and signed by a <br />professional engineer in the State of Ohio <br />(h) Manufacturer's specification sheets for all small cell facility equipment proposed, <br />including poles, equipment cabinets, shrouds, or concealment devices, antennas, <br />meters, radios, switches, telecommunications demarcation boxes, and grounding <br />equipment. <br />(i) Scaled and dimensioned landscape plans associated with required screening of ground <br />mounted small cell equipment (where applicable), including a planting plan with <br />proposed plant species, quantities, spacing, height at installation, and planting details. <br />(F) Required Application Materials for Small Cell Facilities Removal. For applications involving <br />the removal of small cell facilities under an Eligible Facilities Request, the following materials <br />and information shall be provided: <br />(1) Completed application form and fee as specified on the application. <br />(2) A scaled and dimensioned site plan (not smaller than one inch equals 20 feet) clearly <br />indicating the following: <br />(a) Proposed location within the right-of-way including nearest cross street intersection; <br />(b) Adjacent parcel(s) perpendicular to the existing small cell facility location property <br />ownership, including current ownership. <br />(c) All existing conditions within 50 feet of the existing small cell facilities locations to be <br />removed, including but not limited to, buildings, utilities within the right-of-way and <br />associated above grade structures, location of electric service and fiber optic cable, all <br />other underground and overhead utilities, small cell structures and facilities, <br />sidewalks/shared-use paths, back of adjacent curb/edge of pavement, driveways, street <br />trees and plant material. <br />(3) Scaled and dimensioned site and/or structure remediation details in accordance with Small <br />Cell Design Guidelines requirements (not smaller than 1 inch equals 4 feet) clearly <br />indicating the following: <br />10 <br />