My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-057 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
2018
>
2018-057 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2018 4:25:47 PM
Creation date
6/22/2018 4:04:56 PM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2018-057
Legislation Date
6/19/2018
Year
2018
Legislation Title
New Chapter 904
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
in accordance with state and federal law or documentation intended to illustrate the need <br />for the request or to justify the business decision for the request, does not toll the time <br />period. <br />(3) The time period for granting or denying consent resumes when the entity makes a <br />supplemental submission in response to the city's notice of incompleteness. <br />(4) If a supplemental submission is inadequate, the city shall notify the entity not later than ten <br />days after receiving the supplemental submission that the supplemental submission did not <br />provide the information identified in the original notice delineating missing documents or <br />information. The time period may be tolled in the case of second or subsequent notices <br />under the procedures identified in this section. Second or subsequent notices of <br />incompleteness may not specify missing documents or information that was not delineated <br />in the original notice of incompleteness. <br />(E) Timeframe for completion ofpermit. <br />(1) Permits granted for an Eligible Facilities Requests, Collocations with Substantial <br />Modifications and New Wireless Support Structures shall be completed by the operator <br />or its agent within 180 days after issuance of the permit, unless: <br />(a) The city and the operator agree to extend this period; or <br />(b) A delay is caused by make-ready work for a city -owned wireless support structure <br />or decorative pole or by the lack of commercial power or backhaul availability at <br />the site, provided that: <br />1. The operator has made a timely request within 60 days after the issuance of the <br />permit for commercial power or backhaul services; and <br />2. The additional time to complete installation does not exceed 360 days after <br />issuance of the permit. <br />(2) If (1)(a) and (b) of this section cannot be met, the permit shall be void unless the city <br />grants an extension in writing to the operator. <br />(F) Consolidated application for multiple small cell facilities and/or wireless support structures. <br />(1) Applicants seeking to construct, modify, collocate, or replace more than one small cell <br />facility or more than one wireless support structure may file at the applicants discretion, a <br />consolidated application for up to 30 small cell facility requests or up to 30 wireless <br />support structure requests in a single application and receive a single permit for the <br />construction, modification, collocation, or replacement of the small cell facilities or <br />wireless support structures subject to the following: <br />(a) This single application may be filed for multiple small cell facilities or multiple <br />wireless support structures only if they are of substantially the same type. <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.