My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-075 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
2018
>
2018-075 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2018 3:42:06 PM
Creation date
8/24/2018 3:32:48 PM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2018-075
Legislation Date
8/21/2018
Year
2018
Legislation Title
Amend 904
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(3) Scaled and dimensioned site and/or structure remediation details in accordance with <br />Small Cell Design Guidelines requirements (not smaller than 1 inch equals 4 feet) <br />clearly indicating the following: <br />(a) Proposed remediation plan for modifications made to city -owned wireless support <br />structures and other areas of the right-of-way associated with collocation of small <br />cell wireless facilities and ground mounted equipment after the removal of these <br />facilities. <br />(b) Proposed restoration of electric and fiber optic connections after removal of small <br />cell facilities, as applicable. <br />(G)City Engineer's Authority to Specify Required Application Materials. The City Engineer <br />may, in connection with pre -conference review or upon application submission, <br />administratively determine what, if any, plans or diagrams are necessary to satisfy <br />application requirements. The City Engineer is authorized to reasonably interpret <br />and apply codified requirements, and to exercise i*g discretionary authority to <br />establish forms and procedure for submission requirements. <br />904.05 APPLICATION REVIEW TIMEFRAMES AND PROCESS <br />(A) Permit Application Review Timeframes. <br />(1) Eligible Facilities Request (Type I). The city shall process Eligible Facilities Requests in <br />accordance with Ohio Revised Code, 47 C.F.R. 1.40001, and this Chapter 904, not later <br />than 60 days after the date of filing of a completed application. <br />(2) Collocation with Substantial Modifications (Type II). The city shall grant or deny its <br />consent for requests to collocate, or to replace or modify a small cell facility on an <br />existing wireless support structure where substantial modifications are required to the <br />wireless support structure not later than 90 days after the date of filing by a persen of a <br />completed application. <br />(3) New Wireless Support Structure (Type III). The city shall grant or deny its consent for <br />requests to construct, modify, or replace a wireless support structure associated with a <br />small cell facility not later than 120 days following the date of filing of a completed <br />application by an entity. <br />(4) Wireless Support Structure Removal (Type IV). The city shall grant or deny its consent <br />for requests to remove wireless support structures associated with small cell facilities <br />from the right-of-way <br />not later than 30 days after the date of filing of <br />H1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.