Laserfiche WebLink
70G Landmarks Commission 165.10 <br />(1) Issue a Certificate of Appropriateness, if the Commission finds that the <br />proposed work is compatible with the character of the Landmark District <br />as described in the designating ordinance, and will have no adverse <br />impact upon any Landmarks located in the district within 500 feet of the <br />proposed work site; or <br />(2) Designate a time, date and place for a public hearing to be held no <br />longer than forty-five (45) days from the date of receipt of the permit <br />application by the Commission. <br />(c) Action by Commission. The Commission's review of building permit <br />applications for proposed work, as set forth in subsections (a)(3), (a)(4) and (a)(5) of Section <br />165.07, shall be subject to the public hearing requirements of Section 165.10. Following said <br />hearing, the Commission, within thirty (30) days after said hearing, shall make findings and a <br />recommendation to approve or deny the application for a building or demolition permit. The <br />findings of the Commission shall be based upon its consideration of the criteria specifically set <br />forth in Section 165.10 or elsewhere within this chapter. <br />(d) Action by Building Commissioner. Upon receiving the findings and <br />recommendations of the Commission, the Building Commissioner shall further process the <br />applicant's building or demolition permit application in accordance with the other applicable <br />laws of the City; provided, however, that a demolition permit shall not be issued without a <br />building permit having prior thereto been first approved and issued for a building or structure <br />to replace the building or structure scheduled for demolition. <br />(Ord. 99-40. Passed 5-5-99.) <br />165.10 PUBLIC HEARING REQUIREMENTS; APPEALS. <br />(a) Commission to Conduct Hearings. Public hearings of the Commission are to be <br />conducted by the Commission itself or by such members or member it designates; provided, <br />however, that if such public hearing is not conducted by the entire Commission, the person so <br />conducting it shall transmit a written report thereupon and forthwith to all Commission <br />members. The Commission or its designated member conducting the hearing may adopt such <br />rules or limits as may be necessary to govern the hearing within the proper spirit and purposes <br />of this chapter. <br />(b) Notification of Hearings of the Commission. Written notice of public hearings <br />of the Commission shall be sent to the owner of the property and to the building permit <br />applicant (if different from the owner), giving the time, date, place and subject of the public <br />hearing, not less than fifteen (15) days prior to the hearing. In addition, a sign indicating the <br />proposed action and the time, date and place of the hearing shall be posted by the owner or <br />applicant on the property being considered not less than seven (7) days prior to the hearing. <br />Such signs shall be on a form provided by the Commission and shall be prominently displayed <br />and easily readable from abutting public ways. <br />July 2018 Replacement <br />