My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
82-026 Ordinance
Document-Host
>
City North Olmsted
>
Legislation
>
1982
>
82-026 Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2019 11:58:13 AM
Creation date
12/26/2013 9:16:00 AM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
82-026
Legislation Date
3/16/1982
Year
1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
??yy? v::; ? <br />parties hereto. If such a fixed limit has been established, the Architect <br />shall be permitted to include contingencies for design, bidding and price <br />escalation, to determine what materials, equipment, component systems and <br />types of construction are to be included in the Contract Documents, to make <br />reasonable adjustments in the scope of the Project and to include in the <br />Contract Documents alternate bids to adjust the Construction Cost to the <br />Fixed limit. Any such fixed limit shall be increased in the amount of any <br />increase in the Contract Sum occurring after execution of the Contract for <br />Construction. <br />3.2.3 If the Bidding or Negotiation Phase has not commenced <br />within three (3) months after the Architect submits the Construction <br />Documents to the City, any Project budget or fixed limit of Construction Cost <br />shall be adjusted to reflect any change in the general level of prices in <br />the construction industry between the date of submission of the Construction <br />Documents to the City and the date on which proposals are sought. <br />3.2.4 If a Project budget or fixed limit of Construction Cost <br />(adjusted as provided in Subparagraph 3.2.3) is exceeded by the lowest bona <br />fide bid or negotiated proposal, the City shall (1) give written approval of <br />an increase in such fixed limit, (2) authorize rebidding or renegotiating of <br />the Project within a reasonable time, (3) if the Project is abandoned, terminate <br />in accordance with Paragraph 10.2, or (4) cooperate in revising the case of <br />(4), provided a fixed limit of Construction Cost has been established as a <br />condition of this Agreement, the Architect, without additional charge, shall <br />modify the Drawings and Specifications as necessary to comply with the fixed <br />limit. The providing of such service shall be the limit of the Architect's <br />responsibility arising from the establishment of such fixed limit, and haVing <br />done so, the Architect shall be entitled to compensation for all services <br />performed, in accordance with this Agreement, whether or not the Construction <br />Phase is commenced. <br />ARTICLE 4_ PAYMENTS TO THE ARCHITECT <br />4.1 Payments on Account of Basic Services <br />4.1.1 Payments for Basic Services shall be made monthly and <br />shall be in proportion to services performed within each Phase of services, <br />on the basis set forth in Article 12. <br />4.2 Payments Withheld <br />4.2.1 No deductions shall be made from the Architect's compensation <br />on account of penalty, liquidated damages or other sums withheld from payments <br />to contractors, or on account of the cost of changes in the Work other than <br />those for which the Architect is held legally liable. <br />4.3 Project Suspension or Termination <br />4.3.1 If the Project is suspenced or abandoned in whole or in <br />part for more than three months, the Architect shall be compensated for all <br />services performed prior to receipt of written notice from the Qwner of such <br />suspension or abadonment, and all Termination Expenses as defined in Paragraph <br />8.4. If the Project is resumed after being suspended for more than three (3) <br />months, the Architect's compensation shall be equitably adjusted. <br />- 7-
The URL can be used to link to this page
Your browser does not support the video tag.