My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-066 Resolution
Document-Host
>
City North Olmsted
>
Legislation
>
2019
>
2019-066 Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2019 12:48:23 PM
Creation date
6/20/2019 2:18:05 PM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2019-066
Legislation Date
6/18/2019
Year
2019
Legislation Title
Harrington Electric Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Harrington Electric Co. <br />Building Infrastructure Improvements <br />Work Scope and Qualifications <br />F.PM-Findings/ Recommended Scope of Work <br />• Furnish all hardware, utility coordination, and related labor to increase the primary <br />transformer from I50kva to 500kva, or as directed in cooperation with the utility engineering. <br />• Furnish all hardware and related labor to install (1) 1600 amp primary distribution board and <br />225 amp branch panel to accommodate A) the proposed HVAC improvements design, and B) <br />provide adequate over current and expansion switch space. <br />• Furnish all hardware and related labor to install adequate grounding to include A) primary, <br />service ground, B) structural steel cad welds, and C) cold water/ mechanical. <br />• Furnish all hardware and related labor to migrate the existing industrial compressors and <br />dyna-lift from the emergency output board to the primary, "normal" distribution. <br />• Furnish all hardware and related labor to migrate 60`,'0 of the fleet and bus lighting, all <br />overhead doors, and 50%, of the radiant heaters from the "normal" secondary distribution to <br />the emergency output board. <br />• Furnish all hardware and related labor to replace the existing obsolete/ deteriorated non iso <br />automatic transfer switch with (1) new 400 amp isolation bypass ATS and monitoring <br />platform. <br />• Furnish all hardware and related labor to install (1) 30 circuit lighting contractor for the <br />purpose of removing the buss and fleet light switching at the branch panels. <br />• Furnish all hardyNlare, engineering coordination and related labor to assemhie accurate "one - <br />lines". branch level circuit tracing, and updated panel schedules throughout. <br />• Furnish all hardware, facility coordination, mechanical rigging, testing and commissioning. as <br />necessary to replace the existing obsolete/ deteriorated emergency generator, with (1) new <br />l50kW Caterpillar generator and enclosure. <br />Electrical Coi�strurtiorr•Voice/Data%Vicleo•t�%esuar;"fiuitd *24-hour Service •Lamp and Ballast f ecyciirlg <br />Ohio Contractor License No. 11951 <br />
The URL can be used to link to this page
Your browser does not support the video tag.