Laserfiche WebLink
Spaciahat in Curod-In-Placa Pip* Rohabilitation Tochnalogy <br />p 1 p E VISION•PRODUCTS -, <br />320 Raccuglla Dr. LaSaft, IL 81301 Ph: 813-220.1919 Fax: 815-220-1918 <br />EXHIBIT <br />Uj <br />W <br />J <br />-A <br />Q <br />a <br />PROPOSAL NUMBER: OH -9182036 -RF <br />I DATE: 9/18/2020 <br />PROPOSED PROJECT: 36" backyard CIPP Install <br />IJOB LOCATION: North Olmsted <br />PROPOSAL SUBMITTED TO: City of North Olmsted <br />We will verify the following: a) Diameter, b) length, c) active laterals, and d) the manhole depth. <br />KEY CONTACT PERSON: Joe Auner <br />EMAIL: aunerj@north-olmsted.com <br />BUSINESS ADDRESS: 23775 Mastick Road <br />Once the designs are completed we will have the liners wet -out at the Fast Pipe wet -out facility. <br />CITY: North Olmsted <br />STATE/ZIP: Ohio 44070 <br />PHONE: 404-716-4176 <br />1 FAX: <br />NOTE: Pipevision Inc. proposes to furnish all necessary materials, labor, tools, equipment, supplies and the <br />supervision necessary to perform the work outlined in the DESCRIPTION and SCOPE OF WORK with the exception <br />of those items that have been SDecificallv addressed in the TERMS AND CONDITIONS of this DroDosal. <br />DESCRIPTION: Installation of 36" pull in Place liner <br />1. <br />SCOPEOF •• <br />We will mobilize our crew and equipment to the projected location. <br />2. <br />We will televise and clean the pipes specified in the contract. <br />3. <br />We will verify the following: a) Diameter, b) length, c) active laterals, and d) the manhole depth. <br />4. <br />We will do CIPP designs based on fully deterioriated pipe. <br />5. <br />Once the designs are completed we will have the liners wet -out at the Fast Pipe wet -out facility. <br />6. <br />The liner will be transported to the jobsite in a refrigerated truck. <br />7. <br />We will install the liners with a air inversion unit. <br />8. <br />Once the liner is installed we will process the liners with a steam air mixture. <br />9. Upon seeing an exotherm of 140 degrees F or more (thermocouple wire between the host pipe and the liner)we <br />will post cure and cool the liner. <br />10. Once the liner is cured, we will cut the ends and robotically reinstate the service connections that are active. <br />11. Once this process is complete, we will televise and record the finished liner on a flash drive or DVD. <br />DESCRIPTION•AMOUNT <br />36 in / 900 mm CIPP Lining backyard $310.00 <br />200 <br />$ 62,000.00 <br />$0.00 <br />0 <br />$ - <br />$0.00 <br />0 <br />$ - <br />$0.00 <br />0 <br />$ - <br />$0.00 <br />0 <br />$ - <br />$0.00 <br />0 <br />$ - <br />$0.00 <br />0 <br />$ - <br />$0.00 <br />0 <br />$ - <br />$0.00 <br />0 <br />$ - <br />$ - <br />• • <br />$ 62,000.00 <br />Page 1 of 3 <br />