My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-090 Resolution
Document-Host
>
City North Olmsted
>
Legislation
>
2018
>
2018-090 Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2021 3:59:25 PM
Creation date
2/19/2021 3:58:37 PM
Metadata
Fields
Template:
North Olmsted Legislation
Legislation Number
2018-090
Legislation Title
Cleveland Water Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Improvement, upto amaximum of8% of the actual construction costs of the water <br />work portion of the Capital Improvement. PURVEYOR shall pay MUNICIPALITY after <br />receipt of an invoice in accordance with the provisions set forth in Paragraph IV. C <br />I Approval of Construction Administration Costs, MUNICIPALITY shall provide most <br />estimates and schedules to PURVEYOR relative to construction administration services, <br />including inspection services and preparation of as -built drawings, and shall obtain <br />PURVEYOR's written approval prior to commencement of construction. <br />3.shallPURVEYOR shall reimburseMUNICIPALITYf0rC0DStrucUon administration foractual costs incurred, but not 10 <br />exceed 5% nfthe actual construction cost o[the water work. PURVEYOR shall pay <br />MUNICIPALITY after receipt ofan invoice in accordance with the provisions set forth <br />in Paragraph IV. C below. <br />B. Reimbursement of Construction Costs. PURVEYOR shall compensate MUNICIPALITY for <br />the estimated construction costs based on the bid prices of the winning bidder. <br />1. In those Capital Improvements projects that include items inaddition totile approved <br />water work, the cost of which is at least 1096 of the total contract value, the average <br />total cost (defined as the total vvDL2r work cost, not including any contingency <br />d||OvvanCe, divided by the lineal feet Ofwater main vvOrk\ to perform the water work <br />portion of each Capital Improvement must fall within O range of acceptable average <br />costs, identified in Table 2 (attached hJthese Terms and Conditions). Should the <br />average total cost fall outside the range, PURVEYOR shall pay the upper or lower lirnit <br />value Shown in Table 2, whichever is closer to the actual, average total cost. <br />a. PURVEYOR shall adjust, in accordance with the index in the <br />Engineering News Record, Table 2 no more often than January of each <br />year. PURVEYOR shall send the revised Table Zh)the COG and to any <br />rOUDiC|p8|itv with e [3p|tn| Improvement png8Ct in the upCOming year. <br />Such DdiVStnlentI Shd|| apply only to those construction contracts that ate <br />bid after the GdhUStrnonts have been promulgated. <br />2. In those Capital Improvement projects in which the cost Oftile water work is more <br />than 90% of the total contract value, the ranges in Table 2 shall not apply. <br />3. In accordance with Article 8.02 of the Water Service Agreement, as amended, between <br />the parties, PURVEYOR shall not beobligated bo reimburse MUNICIPALITY for any <br />street opening and traffic permits. <br />C. Pavment Process for Reimbursement of Proiect Costs. PURVEYOR shall pay <br />MUNI[IPALlTY for the actual Design costs (subject tOthe limits adjcu|8Lpd in Paragraph <br />IV. A. 1 and in advance for the estimated Construction and Administrative costs of each <br />Capital lnnpr0v8rnCnt. PURVEYOR shall pay MUNICIPALITY for the design, administrative <br />and construction [0S1s within forty-five (45) days Ofreceipt nfan approvable invoice that <br />is in Compliance with PURVEYOR'S policies. MUNICIPALITY shall invoice PURVEYOR for <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.